Laserfiche WebLink
M# M M M M M M M M M M M M M M M M <br />Table 5. Proposed Work Schedule. <br />WEEKS <br />Activity 0 10 15 20 25 30 <br />I) Work Plan Approval I ---- 8----I <br />II) Field Investigation <br />Lab turn around time <br />III) Evaluate Data <br />Report Prep. <br />Draft Report Review <br />r <br />Final Report Prep. <br />6 --- I <br />6 --- I__2 -_I <br />I ------7------I <br />I---3-- I <br />TOTAL: 28 Weeks <br />