My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
502
>
2200 - Hazardous Waste Program
>
PR0505941
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 2:39:30 PM
Creation date
4/5/2019 8:21:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0505941
PE
2220
FACILITY_ID
FA0006033
FACILITY_NAME
PG&E: Tracy Service Center
STREET_NUMBER
502
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
250-020-05
CURRENT_STATUS
01
SITE_LOCATION
502 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2220_PR0505941_502 E GRANT LINE_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
453
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Plan <br />Revision 6 <br />1/8/1988 <br />Page 20 of 37 <br />labelling and preparation dates. Reagents are not to be used after the <br />date at which their stability may become suspect. Standard solutions are <br />to be freshly prepared according to lab instructions. Findings are to be <br />discussed at monthly safety meeting. <br />6.5 Chain of Custody Checks <br />At the end of each month the chain of custody file for that month is <br />to be checked for proper usage. <br />6.6 Corrective Action Procedure <br />Should any of the above checks indicate improper adherence to quality <br />assurance guidelines or procedures the matter is to be brought to the <br />attention of the laboratory director. The director in tum will review the <br />matter and take corrective action. <br />When a method is found to be out of control, the GA Officer proposes a <br />course of corrective action, to be entered on ELI form QA -01 corrective <br />action request form, entry is also made in ELI QA -02 master log. The <br />laboratory director must approve the plan indicating steps taken to improve <br />the method. The Analysis Coordinator ensures the implementation of the <br />improvements, working closely with the Group Managers. Before the method <br />may be used again for reportable data, it must be demonstrated that the <br />method is back in control. To demonstrate this, the failed test must be <br />repeated successfully. In addition, there should be another kind of <br />verification, such as replication, check sample or control, depending on <br />the nature of the original failed test. <br />The status of the Quality Assurance program is to be reported bi- <br />monthly in a form of topical report. The Quality Control Officer, with <br />� <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.