My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2300 - Underground Storage Tank Program
>
PR0231706
>
INSTALL 1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2019 3:37:18 PM
Creation date
4/10/2019 1:40:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1995
RECORD_ID
PR0231706
PE
2361
FACILITY_ID
FA0000485
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95242
APN
05532024
CURRENT_STATUS
01
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f 1-i iril A LUll 1 (-HL F'HUHL 1'40. . "-UH --b, �J�rJ I`Id�. 1`• 1'v'�` 11.�:UHI'I I'U <br /> 05,;IV95 13,'Z7 FAX 012 887 1870 XERXES CORP. D T(T/j� 003%003 <br /> MAY 1qq <br /> 2, Open the monitor frtnr,g not connect 6hir Q quirk <br /> '11111,1111ir-0 It... d16 mnect ae88n ly. <br /> ENVI (_ Mair as <br /> NTC ebur tanK mly amae on site with A hose,Y"wen*b,(sm�2 3 NV1 3. Pressurtze the p ary tank <br /> or vAth a puck Olso 11W U$b may(see Fipurt 2-3 Go).It IN tarp is r101 necessary and allow t ressu o 1' �le valve an <br /> M*Urvd as 5tmm in one or the itluwntJpng prior to ple lrgatIDM t+V,call tale ttmt manlfOld supply I <br /> the XerxR4 0rdkwhJr at ft plant nauW yW or the tndtna 5arYIM dWrt" <br /> gt zarkn'headQ=VrE- 4. Monitor the pressure for hour.SOap test all sarvlce fittings <br /> Nt)SEN and manw8lyS.Watch for olive bubbles whfcll Indicate a leak. <br /> NUTS in order m imi Ute tank.the hoa,JvQlve eaaemotf mutt be wnnech+d trw a �• <br /> mon;wf ftrg to a Ger im f ttm- ; �� I NTLIX+ <br /> PRIMARY(INYEf NAL)TANK TEST <br /> 1. Open one service titt rig and the monitprfltting which is not PRESSUAC AEL ifF Oa vrCs <br /> connected to the hose/valve usembiy.Check to sae VW all :' FMN COMPRESSOR <br /> mmaining service and n1Cl;tttor fittings are property doped,plupoed OUICK 015COW�ECT AIR SUPPLY VALE <br /> aridtlgtltarted. AWNSLY ', AIR SUPPLY GAUGE' <br /> 2. Close the valve on the hose/valve assembly.Metal N tOst hGWOA PITTING 57AvrCE FiMA <br /> marttld in the open service fatting,Connect the p2ssure source <br /> to the test manifold. (See Figure 2.3 HV). <br /> 3. pressurl2e tela pnmary(imerrlal)tank to 5 PSIG.Alk)or FIGURE 2.3 aD <br /> remavD air as necessary and allow the pressure to Stabil&Close <br /> U valve on tft0 test manifold. <br /> 4. Monitor the pmssum for one hour.Soap all ftttings and man- SEDAN (EMRHAL)TANK PEST <br /> ways and%yatoh for active air bubbles which indic aU a WX 1. Malnta a pressure in the prim tank. <br /> 2. Plug the m r flitting which previously open.See Step 2. <br /> PR.55URE REL ff DEVICE CE 3. Free the hose f the servic 'rig by 04119 the nylon tie. <br /> FHOSE/VAL VQ ASSEMBLY FROM COMPAES80R 4. Insert the hose int the qui disconnect check valve(found at <br /> AIR 511PP4 Y VAL Ye the top of the service fft' g). is will allow air to tranAr from the <br /> MANIFOLD VALVE AIR 5l1PPLY GAUGE primary to SECOrI(dlry tart <br /> MONITOR FITTING gERvl LE FITTING 5, Pressurize to 5 PS1G. or remove air via the supply valva as <br /> needed and allow tate p ssu to stabilize.Close tate vdlve on the <br /> test manifold.Discon tho a supply line. <br /> 6. Monitor the P ure for one h r.Soap the entire exterior of <br /> the tank and wat fvr active air bub es which indicate a lock. <br /> t LIRE 2.3 HV _ when the les complete,carefully ref a the,alt pressure trom <br /> SEGONaARY(LrXTERNAI TANK TEST lite tank by opening the supply vdlve.The 'r supply line already <br /> should have been dlsconnected.Whon the air flow from the supply <br /> CAUTION:Do not pre56udn flte secondary tank(interstitial Spaot) valva stops,remove the test manifold. <br /> dlrectly or the primary tank may rupture and cause tank failure. <br /> Once the valve on the hose/NdIve assembly has boon opened,do I I EWE not close It unti all testing is complete and all test pMMm has <br /> boon released. <br /> 1. Maintain the pressur4 on the primary taMc Plug the monitor PRIMA NAL)TANKTEST <br /> fitting which was previously open.Slowly open the valve on the "m;Kw vi t �-ertlra1((tthre reservoir OR top)during the p StB110YI t VY10 <br /> hosa/valve assembly and pressurize the secondary(eXWmal)tank <br /> to 5 PSIG.Add or remove air as needed and allow ttie pressure 10 1. Open one service q and tato Rating o e reservoir. Check <br /> stablltte.Close the valve on the test mantfold.Di=nect lite air for liquid in the reservoir It should be out half full. Do not <br /> supply line, open the monitor fittings— ine will lobi- Check to see that all <br /> 2, Monitor trio pressure for one hour.Soap the entire wxterior of remairtinp service and monitor are property doped,plugged <br /> the tank and watch for active air bubbles which indicate a leak, and tatiWned. <br /> When the test is comp4ate,carefully release the air pressure from 2. Visually deck the interio t tato t for liquid—there should <br /> not by airy Install the tes antfold in the en service fitting. <br /> the tank by opening the air supply valve.The air supply Iltty aho{tid Connect the pressure ice to the test man Id.(See Figure;L-�). <br /> already have boon disconnected. Remove U>El test mar,tioid. 3 Pressunre the p ary(internal)tank to 5 P Add or <br /> OUI 01 NECTASS LY remove air as ne ssary and allow the pressum to bilize.CION <br /> t10hh!:Ino to w the pmm�ry tank alpne,t t r"Q must not be donneclCA the valve on test manifold, Disconnect Ute Air sup V line. <br /> to tau sr.Moe --ia"P ma Von tie fn 4. Monit a pressure(0r one hour.Shap all liftings ant <br /> PRIMARY(tNTER K ways watch for Active air bubbles whicfl Indicate a leak. hock <br /> 1, Connect the test man n availabio service fitting.Check the r r-voir for buUples in tate monitor fluid, <br /> to sae that all rernaining seTvi T n dy g base the pt Mit from thO primary tusk. <br /> ....u�•!nn�4tn4r4annri <br />
The URL can be used to link to this page
Your browser does not support the video tag.