My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2014 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2300 - Underground Storage Tank Program
>
PR0231706
>
COMPLIANCE INFO_2014 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2019 2:30:29 PM
Creation date
4/10/2019 4:46:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014 - 2018
RECORD_ID
PR0231706
PE
2361
FACILITY_ID
FA0000485
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95242
APN
05532024
CURRENT_STATUS
01
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> 416 2nd Street <br /> fforda-Te t OCT 2 2 2018 Galt, CA 95632 <br /> (20191744-0113 Fax (209) 744-0116 <br /> ENVIRONMENTAL H ALTH <br /> E �0TS%NT <br /> Veeder-Root Vapor Polisher Operability Test Form <br /> Permit Number:N-714 Date of Test: 9/26/2018 Time: <br /> Site Name: FLAG CITY CHEVRON <br /> Site Address: 6421 CAPITOL AVENUE <br /> City: LODI, CA Zip: 95240 Technician: ZANE NIMMO <br /> VST: 3000839502 <br /> District: SJVAPCD Veeder-Root: A28446 <br /> Calibration Date: DAILY <br /> TEST INFORMATION <br /> Calibration date for digital manometer(must be within 6 months of the test) 7/13/2018 <br /> Ending value for digital manometer drift test(must be 0.01 in.w.c.or less) .00 <br /> Calibration date for thermometer(must be with 6 months of the test) NCO A <br /> Vapor polisher valve close date and time(must have been closed for at least 2 hours) 9/26/2018 1 0842 <br /> Atmospheric pressure sensor serial number 6 6 3 6 <br /> PRESSURE INTEGRITY TEST <br /> Nitrogen gas flow rate(scfh) 15 SCF H <br /> Starting pressure(in.w.c.) 8.00 <br /> Final pressure at I minute(in.w.c.) 8.19 <br /> Is the final pressure>7.0 in.w.c.? Yes <br /> Is the difference between the starting and final pressure<0.5 in.w.c.? Yes <br /> NOTES: 'If the final pressure is not> 7.0 in. w.c. and the difference is not< 0.5 in. w.c., then the vapor polisher is not in <br /> compliance. <br /> FLOW TEST <br /> Nitrogen gas flow rate(sefh) 18 S C F H <br /> Pressure(in,w.c.) 1.88 <br /> Is the pressure between 1.69 and 2.25 in.w.c.? Yes <br /> NOTES: 'The flow rate must be 18.0 t 0.2 scfh. <br /> 'The pressure must be between 1.69 and 2.25 in.w.c.or the vapor polisher is not in compliance. <br /> 'Three-way valve must be returned to normal(open)operating position after testing is completed. <br /> 4PMC valve mode must be re-set to automatic after testing is completed. <br /> I declare, under penalty ofperjury under the laws of the state of California that based on information and beliefformed <br /> after reasonable inquiry, the statements and information provided in this document are true, accurate, and complete. <br /> Signature of Technician: Date: 9/26/18 <br /> Ver. LI -01.20.09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.