Laserfiche WebLink
SINGULAIR°SERVICE PROGRAM <br /> Semi-annual service inspections, at six month intervals for the first two years of system operation, are provided by your local <br /> Norweco distributor and are included in the original purchase price of the Singulair system. Costs for travel and labor are <br /> not charged to the owner. During an inspection, each mechanical aerator, Bio-Kinetic system and other plant components <br /> are serviced as outlined in the Singulair Product Manual and effluent quality is evaluated for color, turbidity, scum overflow <br /> and odor. After the initial two year service program is completed,the local service provider will provide continued service at <br /> the owner's option. The service program should be renewed by the owner to insure maximum system performance. <br /> FRESH AIR VENT SINGULAIR <br /> ASSEMBLY(TYP.) AERATOR(TYP.) <br /> AERATOR MOUNTING OPTIONAL AERATOR <br /> CASTING(TYP.) EXTENSION RISER(TYP.) <br /> UNDERGROUND POWER SUPPLY CABLE BIO-KINETIC SYSTEM <br /> TO SINGULAIR CONTROL CENTER(TYP.) MOUNTING CASTING <br /> PRETREATMENT/AERATION OPTIONAL BLUE CRYSTAL <br /> TRANSFER PORT CHLORINATION SYSTEM <br /> PRETREATMENT ACCESS OPTIONAL BIO-NEUTRALIZER <br /> CASTING(TVP.) DECHLORINATION SYSTEM <br /> bJ b•d <br /> DESIGN FLOW LINE —_ <br /> INLETEFFLUENT <br /> LINE `• -- ` ' k LINE <br /> " a <br /> BIO-KINETIC <br /> SYSTEM <br /> PRETREATMENT CLARIFICATION <br /> CHAMBER CHAMBER <br /> AERATION AERATION BIO-STATIC <br /> CHAMBER CHAMBER SLUDGE RETURN <br /> PROFILE VIEW <br /> SINGULAIR 1000 GPD,1250 GPD&1500 GPD <br /> Ask your Singulair service provider about a renewable service contract. If you allow service coverage to expire, you can still <br /> obtain the professional assistance of a factory-trained technician. However, these special service calls will be performed <br /> on a time and materials basis. Professional service is important to proper system operation and should not be allowed to <br /> lapse. Be sure to consider the advantages of a renewable service contract. <br /> The Singulair service provider will perform the following services during each service inspection: <br /> ✓ Check aerator operation ✓ Inspect outlet coupling <br /> ✓ Check aerator power consumption ✓ Install a clean Bio-Kinetic system <br /> ✓ Check aerator air delivery ✓ Fill Blue Crystal feed tube <br /> ✓ Clean stainless steel aspirator shaft ✓ Fill Bio-Neutralizer feed tube <br /> ✓ Clean aspirator tip ✓ Inspect effluent quality <br /> ✓ Clean fresh air vent in concrete cover ✓ Inspect outlet line <br /> ✓ Inspect aeration chamber contents ✓ Inspect ground water relief point <br /> ✓ Check operation of control center ✓ Inspect effluent disposal system <br /> ✓ Adjust time clock when required ✓ Complete 3-part service record <br /> ✓ Remove the Bio-Kinetic system ✓ Hang owner's record on front door <br /> ✓ Scrape the clarification chamber ✓ Enter record into www.servicepromcd.com <br /> ✓ Inspect the Bio-Static sludge return ✓ Mail health department notification <br />