Laserfiche WebLink
TABLE OF CONTENT <br /> Spill Prevention Control and Countermeasures Plan <br /> MOUNTAIN VALLEY EXPRESS <br /> 1019 Bessemer Avenue, Manteca (San Joaquin County), California <br /> SECTION PAGE <br /> 1.0. INTRODUCTION AND PURPOSE........................................................................ 1 <br /> 1.1. SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN (SPCCP) <br /> PREPARATION AND [40 CFR § 112] ............................................................................ 1 <br /> 1.2. ADDITIONAL SPCCP USES.......................................................................................... 1 <br /> 1.3. SUBSTANTIAL HARM DETERMINATION ..................................................................... 1 <br /> 1.4. SPCCP GUIDANCE TO THE FACILITY......................................................................... 1 <br /> 1.4.1. Inspections, Tests and Records .................................................................. 1 <br /> 1.4.2. Preventative Maintenance ........................................................................... 2 <br /> 1.4.3. Employee Training....................................................................................... 2 <br /> 1.4.4. Discharge Reporting.................................................................................... 2 <br /> 1.4.5. Plan Review................................................................................................. 2 <br /> 1.4.6. Amendment Re-certification Time Frame .................................................... 3 <br /> 1.4.7. SPCCP Review Time Frame ....................................................................... 3 <br /> 2.0. PLAN ADMINISTRATION AND FACILITY INFORMATION................................. 3 <br /> 2.1. MANAGEMENT APPROVAL AND DESIGNATED PERSONNEL [40 CFR 112.7].......... 3 <br /> 2.2. TECHNICAL PROFESSIONAL ENGINEER CERTIFICATION [40 CFR 112.3(d)].......... 3 <br /> 2.3. LOCATION OF THE SPCCP (40 CFR 112.3(e)) ............................................................ 4 <br /> 2.4. PLAN REVIEW (40 CFR 112.3 and 112.5)..................................................................... 4 <br /> 2.4.1. Changes in Facility Configuration ................................................................4 <br /> 2.4.2. Technical Plan Amendment.........................................................................4 <br /> 2.4.3. Non-Technical Plan Amendment................................................................. 5 <br /> 2.4.4. Plan Revision............................................................................................... 5 <br /> 2.4.5. Scheduled Plan Reviews.............................................................................5 <br /> 2.4.6. Record of Plan Reviews ..............................................................................5 <br /> 2.5. FACILITIES, PROCEDURES, METHODS, OR EQUIPMENT NOT YET FULLY <br /> OPERATIONAL (40 CFR 112.7)..................................................................................... 5 <br /> 2.6. CROSS-REFERENCE WITH SPCC PROVISIONS (40 CFR 112.7) .............................. 6 <br /> 2.7. GENERAL FACILITY INFORMATION............................................................................ 6 <br /> 2.8. Facility DESCRIPTION (40 CFR 112.7(a)(3)) .............................................................. 6 <br /> 2.8.1. Location and Activities................................................................................. 6 <br /> 2.8.2. Hours of Operation and Personnel .............................................................. 7 <br /> 2.8.3. Facility Figures ............................................................................................ 7 <br /> 2.8.4. Facility Location........................................................................................... 7 <br /> 2.8.5. Facility Operating Structures and Areas ...................................................... 7 <br /> 2.9. OIL STORAGE............................................................................................................... 7 <br /> 2.10. EVALUATION OF DISCHARGE POTENTIAL.............................................................. 8 <br /> 2.10.1 . Distance to Navigable Waters and Adjoining Shorelines and Flow Paths.... 8 <br /> 2.10.2. Discharge History......................................................................................... 8 <br /> 3.0. DISCHARGE PREVENTION - GENERAL SPCC PROVISIONS.......................... 8 <br /> 3.1. COMPLIANCE WITH APPLICABLE REQUIREMENTS (40 CFR 112.7(a)(2))................ 9 <br /> 3.2. FACILITY LAYOUT DIAGRAM (40 CFR 112.7(a)(3))..................................................... 9 <br /> 3.3. SPILL REPORTING (40 CFR 112.7(a)(4)) ..................................................................... 9 <br />