Laserfiche WebLink
TABLE OF CONTENT <br /> Spill Prevention Control and Countermeasures Plan <br /> MOUNTAIN VALLEY EXPRESS <br /> 1019 Bessemer Avenue, Manteca (San Joaquin County), California <br /> SECTION PAGE <br /> 3.4. POTENTIAL DISCHARGE VOLUMES AND DIRECTION OF FLOW (40 CFR <br /> 112.7(b)) ....................................................................................................................... 9 <br /> 3.5. CONTAINMENT AND DIVERSIONARY STRUCTURES (40 CFR 112.7©)...................10 <br /> 3.5.1. Spill Pallets................................................................................................ 10 <br /> 3.5.2. Unloading Area.......................................................................................... 10 <br /> 3.5.3. Transfer Areas........................................................................................... 10 <br /> 3.5.4. Drainage System ....................................................................................... 10 <br /> 3.6. PRACTICABILITY OF SECONDARY CONTAINMENT (40 CFR 112.7(d))....................11 <br /> 3.7. INSPECTIONS, TESTS, AND RECORDS (40 CFR 112.7(e)).......................................11 <br /> 3.7.1. Daily Inspection ......................................................................................... 11 <br /> 3.7.2. Monthly Inspection..................................................................................... 11 <br /> 3.7.3. Annual Inspection ...................................................................................... 12 <br /> 3.7.4. Periodic Integrity Testing ........................................................................... 12 <br /> 3.7.5. Personnel, Training, and Discharge Prevention Procedures <br /> 40 CFR 112.7(f))........................................................................................ 12 <br /> 3.8. SECURITY (40 CFR 112.7(9)) ......................................................................................13 <br /> 3.9. TANK TRUCK UNLOADING AREAS REQUIREMENTS (40 CFR 112.7(h))..................13 <br /> 3.9.1. Secondary Containment (40 CFR 112.7(h)(1)).......................................... 14 <br /> 3.9.2. Unloading Procedures (40 CFR 112.7(h)(2) and (3)) ................................ 14 <br /> 3.10. BRITTLE FRACTURE EVALUATION (40 CFR 112.7(I)).............................................14 <br /> 3.11. CONFORMANCE WITH STATE AND LOCAL APPLICABLE <br /> REQUIREMENTS (40 CFR 112.70))......................................................... 14 <br /> 4.0. DISCHARGE PREVENTION — SPCC PROVISIONS FOR THE FACILITY........ 14 <br /> 4.1. FACILITY DRAINAGE (40 CFR 112.8(b)) ....................................................................15 <br /> 4.2. BULK STORAGE CONTAINERS (40 CFR 112.8©).......................................................15 <br /> 4.2.1. Construction (40 CFR 112.8 (c)(1)) ........................................................... 15 <br /> 4.2.2. Secondary Containment (40 CFR 112.8(c)(2)).......................................... 15 <br /> 4.2.3. Drainage of Berm Areas (40 CFR 112.8(c)(3)).......................................... 16 <br /> 4.2.4. Corrosion Protection (40 CFR 112.8(c)(4))................................................ 16 <br /> 4.2.5. Partially Buried and Bunkered Storage Tanks (40 CFR 112.8(c)(5))......... 16 <br /> 4.2.6. Inspections and Tests (40 CFR 112.8(c)(6)).............................................. 16 <br /> 4.2.7. Heating Coils (40 CFR 112.8(c)(7)) ........................................................... 16 <br /> 4.2.8. Overfill Prevention Systems (40 CFR 112.8(c)(8)) .................................... 16 <br /> 4.2.9. Effluent Treatment Facilities (40 CFR 112.8(c)(9)).................................... 17 <br /> 4.2.10.Visible Discharges (40 CFR 112.8(c)(10))................................................... 17 <br /> 4.2.11 .Mobile and Portable Containers (40 CFR 112.8(c)(11)).............................. 17 <br /> 4.3. TRANSFER OPERATIONS, PUMPING, AND IN-PLANT PROCESSES <br /> (40 CFR 112.8(d)) .........................................................................................................17 <br /> 4.3.1. Transfer Lines Not In Service .................................................................... 18 <br /> 4.3.2. Transfer Lines On Standby........................................................................ 18 <br /> 4.3.3. Pipe Supports............................................................................................ 18 <br />