Laserfiche WebLink
15 February 2016 AdvancedGeo <br /> AGE Project No. 12-2181 Environmental <br /> Page 5 of 23 <br /> 2.4.3. Non-Technical Plan Amendment <br /> Non-technical amendments can be certified by the Facility owner/operator and <br /> documented on Table 1. Non-technical amendments include the following: <br /> • Change in the name or contact information (i.e., telephone numbers) of <br /> individuals responsible for the implementation of this Plan; or <br /> • Change in the name or contact information of spill response or cleanup <br /> contractors. <br /> 2.4.4. Plan Revision <br /> The Facility makes needed revisions to the Plan as soon as possible, but no later than <br /> six months after the change occurs. The Plan is implemented as soon as possible <br /> following any technical amendment, but no later than six months from the date of the <br /> amendment. The Coordinator is responsible for initiating and coordinating revisions to <br /> this Plan. <br /> 2.4.5. Scheduled Plan Reviews <br /> In accordance with 40 CFR 112.5(b), the Facility reviews this Plan at least once every <br /> five years. Revisions to the Plan, if needed, are made within six months of the five-year <br /> review. A PE certifies any technical amendment to the Plan, as described above, in <br /> accordance with 40 CFR 112.3(d). The last SPCC review occurred on February 2011 <br /> 2015. This Plan is dated 01 February 2016. The next plan review is therefore scheduled <br /> to take place on 31 January 2021. <br /> 2.4.6. Record of Plan Reviews <br /> Scheduled reviews and Plan amendments are recorded in the Plan Review Log <br /> (Table 1). This log is completed even if no amendment is made to the Plan as a result of <br /> the review. Unless a technical or administrative change prompts an earlier review of the <br /> Plan, the next scheduled review of this Plan will occur by to January 31 2021. <br /> 2.5. FACILITIES, PROCEDURES, METHODS, OR EQUIPMENT NOT YET FULLY <br /> OPERATIONAL (40 CFR 112.7) <br /> Bulk storage containers at this Facility have been tested for integrity since installation. <br /> Section 4.2.6 of this Plan describes the inspection program to be implemented by the <br />