My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BESSEMER
>
1019
>
2800 - Aboveground Petroleum Storage Program
>
PR0515715
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2019 2:52:03 PM
Creation date
4/12/2019 10:43:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515715
PE
2832
FACILITY_ID
FA0010328
FACILITY_NAME
MOUNTAIN VALLEY EXPRESS INC
STREET_NUMBER
1019
STREET_NAME
BESSEMER
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
22104067
CURRENT_STATUS
01
SITE_LOCATION
1019 BESSEMER AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 February 2016 AdvancedGeo <br /> AGE Project No. 12-2181 Environmental <br /> Page 4 of 23 <br /> and the requirements of 40 CFR part 112; that procedures for required inspections and <br /> testing have been established; and that this Plan is adequate for the Facility [40 CFR <br /> 112.3(d)]. The PE certification in no way relieves the owner or operator of the Facility of <br /> his/her duty to prepare and fully implement this Plan in accordance with the <br /> requirements of 40 CFR part 112. This Plan is valid only to the extent that the Facility <br /> owner or operator maintains, tests, and inspects equipment, containment, and other <br /> devices as prescribed in this Plan. <br /> 2.3. LOCATION OF THE SPCCP (40 CFR 112.3(e)) <br /> In accordance with 40 CFR 112.3(e), a complete copy of this Plan is maintained at the <br /> Shop office. The shop office is accessible at a minimum, whenever the Facility is <br /> operating, i.e., 8:00 AM to 5:00 PM, 5 days per week (other days to be determined). <br /> Field staff conducts operations seasonally, as determined by the Facility Management. <br /> 2.4. PLAN REVIEW (40 CFR 112.3 and 112.5) <br /> Technical and administrative plan reviews occur for changes in Facility configuration, as <br /> a scheduled five year plan review and are recorded on the Record of Plan Review form <br /> included as Table 1. <br /> 2.4.1. Changes in Facility Configuration <br /> In accordance with 40 CFR 112.5(a), the Facility periodically reviews and evaluates this <br /> Plan for any change in Facility design, construction, operation, or maintenance that <br /> materially affects the Facility's potential for an oil discharge, including, but not limited to: <br /> • Commissioning of containers; <br /> • Reconstruction, replacement, or installation of piping systems; <br /> • Construction or demolition that might alter secondary containment structures; or <br /> • Changes of product or service, revisions to standard operation, modification of <br /> testing/inspection procedures, and use of new or modified industry standards or <br /> maintenance procedures. <br /> 2.4.2. Technical Plan Amendment <br /> Plan amendments made to address changes of Facility configuration (Section 2.4.1.) <br /> are referred to as technical amendments and are certified by a PE. Technical Plan <br /> amendments are documented on Table 1 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.