My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009921
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
152
>
3500 - Local Oversight Program
>
PR0544359
>
ARCHIVED REPORTS XR0009921
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:01 AM
Creation date
4/17/2019 3:27:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009921
RECORD_ID
PR0544359
PE
3528
FACILITY_ID
FA0007196
FACILITY_NAME
RUSSELLS FLOWER PAVILION
STREET_NUMBER
152
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23517305
CURRENT_STATUS
02
SITE_LOCATION
152 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Corrective Action Plan Page 37 <br /> Ethyl Benzene < 0 5 µg/Liter 5 µg/Literl <br /> Total Xylenes < 0 5 µg/Liter 5 µg/Literl <br /> Lead < 5 jig/Liter 50 µg/Liter <br /> Note <br /> 1 The sum of the concentrations of benzene ethyl benzene, toluene and xylenes in any single sample <br /> shall not exceed 5 gg/Liter <br /> The pH of the discharge is limited to not less than 6 5 nor greater than 8 5 and it shall not <br /> be acutely toxic as defined by less than 90% survival of standard test organisms 50% of <br /> the time, and less than 70% survival 10% of the time in 96-hour, static or continuous- <br /> flow, bioassay tests in undiluted samples of the effluent <br /> GROUNDWATER, TREATMENT-SYSTEM AND DISCHARGE MONITORING <br /> The groundwater-quality, treatment-system and discharge monitoring program described <br /> below will be established to check that concentrations of any contaminants in the water <br /> discharged from the treatment system are within permissible limits, provide a database to <br /> guide selection of optimal operating parameters for the groundwater treatment system and <br /> monitor the progress of groundwater remediation <br /> Groundwater-quality Monitoring <br /> Groundwater-quality will be monitored by analysts of samples recovered from the <br /> monitoring and recovery wells <br /> Base-Line Data <br /> To establish base-line data prior to commissioning the groundwater recovery and <br /> treatment system, depths to groundwater will be measured in, and samples will be <br /> recovered from, all of the monitoring and recovery wells installed for the 152 East 11 th <br /> Street site (i a Wells NAV 1 through NAV 8 and Wells RW 1 through RW 3) <br /> Monitaring to Check the Progress of Remediatton <br /> TheProgr ess of remediation will be morvtored by analysis of samples recovered from each <br /> of the wells located within the plume of contamination on the 152 East Street site These <br /> are monitoring wells NAV 1, NAV 3 and NAV 4 and recovery wells RW 1, RW 2 and <br /> RW 3 <br /> To characterize temporal fluctuation in contaminant concentrations, samples will be <br /> recovered from each of the wells listed above within seven days following the start of <br />
The URL can be used to link to this page
Your browser does not support the video tag.