Laserfiche WebLink
Action Plan Pa <br /> Correctivea 44 g <br /> ❑ Authorization to Discharge Treated Groundwater under <br /> NPDES Permit No CA0082929 (CRWQCB) <br /> ❑ Waste Generator's Permit (California Environmental Protection Agency) <br /> ❑ Well Closure Permit (SJCPHS) <br /> REPORTS <br /> To document the construction and operation of the groundwater recovery and treatment <br /> system, to record the progress of remediation and to comply with regulatory reporting <br /> requirements, the following engineenng and status reports will be prepared <br /> ❑ A pre-construction design report for the groundwater recovery and treatment <br /> system, including construction drawings, specifications and specific equipment <br /> selections by manufacturer and model in a form suitable for use with applications <br />' for planning, building and waste discharge permits <br /> ❑ Dnllmg logs and well completion details for each groundwater recovery well <br /> (Copies of these logs will be filed with the California Department of Water <br /> Resources ) <br /> ❑ Operating and Maintenance Manual for the groundwater treatment system, <br /> including as-built drawings <br /> ❑ A post-commissioning engineering report that will include documentation of all <br /> water-quality data obtained in the first three months following remediation system <br /> startup <br /> ❑ An Operating and Maintenance Log for the groundwater recovery and <br /> treatment system <br /> ❑ Quarterly monitonng and status reports to record the progress of remediation <br /> These reports will include the results of the groundwater water-quality <br /> monitonng program according to the requirements of the SJCPHS and document <br /> the results of analyses of the discharge from the groundwater treatment system and <br /> report on the performance of the system according to the requirements of NPDES <br /> Permit No CA0082929 <br /> REMEDIATION SCHEDULE <br /> An proposed remediation schedule, that includes key project rmlestones, is presented in <br /> graphical form on Figure 13 <br /> It is expected that construction drawings and specifications for the groundwater recovery <br /> and treatment system can be completed within four weeks of the date financing becomes <br />