My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1412
>
2200 - Hazardous Waste Program
>
PR0220094
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2019 4:37:31 PM
Creation date
4/18/2019 10:56:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0220094
PE
2247
FACILITY_ID
FA0001479
FACILITY_NAME
SUMIDEN WIRE PRODUCTS CORPORATION
STREET_NUMBER
1412
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
117-360-40
CURRENT_STATUS
01
SITE_LOCATION
1412 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
660
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HAZ WASTE GENERATOR CONDITIONAL EXEMP'T'ION CONDITIONAL AUTHORIZATION PERMIT BY RULE <br /> WM/Frq <br /> Relative Risk Low Low Low Medium <br /> to Public <br /> Health& <br /> Environment <br /> Corrective H&SC 25189.2(c)Prohibits the H&SC 25189.2(c)Prohibits the on-site disposal of hazardous H&SC 25189.2(c)Prohibits the on-site H&SC 25200.10(b)-TTU&FTU <br /> Action& on-site disposal of hazardous waste at an unauthorized point by a generator. disposal of hazardous waste at an Requires corrective action for all haz. <br /> Phase I waste at an unauthorized point by unauthorized point by a generator. waste/constituent releases. <br /> a generator. H&SC 25201.5(d)(8)(A)Requires generator to remove or H&SC 25200.3(c)(3) Title 22 CCR 67450.7-TTU&ITU <br /> decontaminate all waste residues associated with the closure of Generator shall comply with Phase I Requires O/O to establish a corrective <br /> a unit including soils,and structures or equipment contaminated environmental assessment procedures per action program consisting of a Phase I <br /> with hazardous waste from the unit. H&SC 25200.14. Requires removal or environmental assessment and <br /> decontamination of all haz. remediation if a release haz.waste or <br /> waste/constituents resulting from unit constituents has occurred. <br /> closure.If contamination is found,generator <br /> is responsible for expeditious cleanup. <br /> H&SC 25187 Allows DTSC to H&SC 25187 Allows DTSC to issue an order specifying a H&SC 25187 Allows DTSC to issue an H&SC 25187-TTU&FTU <br /> issue an order specifying a schedule for compliance or correction for any release of haz. order specifying a schedule for compliance Allows DTSC to issue an order <br /> schedule for compliance or waste or constituents into the environment. or correction for any release of haz.waste or specifying a schedule for compliance or <br /> correction for any release of haz. constituents into the environment. correction for any release of haz.waste <br /> waste or constituents into the or constituents into the environ. <br /> environment. H&SC 25404.1(a)(3)(A)Allows only DTSC H&SC 25404.1(a)(3)(A)Allows only <br /> to implement and enforce the requirements of DTSC to implement and enforce the <br /> Sections 25200.3(cx3)and 25200.14. requirements of Sections 25200.10 and <br /> 25200.14. <br /> Phase I not required. Phase I not required. H&SC 25200.14(b)(1) H&SC 25200.14(b)(1)-TTU&FrU <br /> Requires a Phase 1 environmental Requires a Phase I environmental <br /> assessment for all CA facilities. assessment for all PBR facilities. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.