Laserfiche WebLink
HAZ WASTE GENERATOR CONDITIONAL EXEMP'T'ION CONDITIONAL AUTHORIZATION PERMIT BY RULE <br /> WM/Frq <br /> Relative Risk Low Low Low Medium <br /> to Public <br /> Health& <br /> Environment <br /> Corrective H&SC 25189.2(c)Prohibits the H&SC 25189.2(c)Prohibits the on-site disposal of hazardous H&SC 25189.2(c)Prohibits the on-site H&SC 25200.10(b)-TTU&FTU <br /> Action& on-site disposal of hazardous waste at an unauthorized point by a generator. disposal of hazardous waste at an Requires corrective action for all haz. <br /> Phase I waste at an unauthorized point by unauthorized point by a generator. waste/constituent releases. <br /> a generator. H&SC 25201.5(d)(8)(A)Requires generator to remove or H&SC 25200.3(c)(3) Title 22 CCR 67450.7-TTU&ITU <br /> decontaminate all waste residues associated with the closure of Generator shall comply with Phase I Requires O/O to establish a corrective <br /> a unit including soils,and structures or equipment contaminated environmental assessment procedures per action program consisting of a Phase I <br /> with hazardous waste from the unit. H&SC 25200.14. Requires removal or environmental assessment and <br /> decontamination of all haz. remediation if a release haz.waste or <br /> waste/constituents resulting from unit constituents has occurred. <br /> closure.If contamination is found,generator <br /> is responsible for expeditious cleanup. <br /> H&SC 25187 Allows DTSC to H&SC 25187 Allows DTSC to issue an order specifying a H&SC 25187 Allows DTSC to issue an H&SC 25187-TTU&FTU <br /> issue an order specifying a schedule for compliance or correction for any release of haz. order specifying a schedule for compliance Allows DTSC to issue an order <br /> schedule for compliance or waste or constituents into the environment. or correction for any release of haz.waste or specifying a schedule for compliance or <br /> correction for any release of haz. constituents into the environment. correction for any release of haz.waste <br /> waste or constituents into the or constituents into the environ. <br /> environment. H&SC 25404.1(a)(3)(A)Allows only DTSC H&SC 25404.1(a)(3)(A)Allows only <br /> to implement and enforce the requirements of DTSC to implement and enforce the <br /> Sections 25200.3(cx3)and 25200.14. requirements of Sections 25200.10 and <br /> 25200.14. <br /> Phase I not required. Phase I not required. H&SC 25200.14(b)(1) H&SC 25200.14(b)(1)-TTU&FrU <br /> Requires a Phase 1 environmental Requires a Phase I environmental <br /> assessment for all CA facilities. assessment for all PBR facilities. <br /> 4 <br />