Laserfiche WebLink
HAL WASTE GENERATOR CONDITIONAL EXEMPTION CONDITIONAL AUTHORIZATION PERMIT BY RULE <br /> crmffi'm <br /> Post Closure Not required if clean closure. Not required if clean closure. Not required if clean closure. Not required if clean closure. <br /> H&SC 25189.2(c)prohibits the H&SC 25245.4(b)(3) H&SC 25245.4(a)(3)-TTU&FTU <br /> on-site disposal of hazardous Generator shall not be required to provide Generator shall not be required to <br /> waste at an unauthorized point by financial assurances for post closure provide financial assurances for post <br /> a generator. maintenance pursuant to H&SC 25245(a)(2). closure maintenance pursuant to H&SC <br /> 25245(a)(2). <br /> Post closure is not required unless If contamination remains after closure,then <br /> one or more of the following If contamination remains after closure,then the facility is also the facility is also subject to generator If contamination remains at either <br /> specified 90 day generator subject to all applicable generator requirements,including requirements,including requirements for TTU&PTU after closure,the owner/ <br /> requirements apply to certain requirements for landfills,pursuant to H&SC 25201.5(d)(9). landfills,pursuant to H&SC 25200.3(c)(1). operator is subject to H&SC <br /> tanks/containers,drip pads,and 25200.10(b)which requires corrective <br /> containment buildings: action for all haz.waste/constituent <br /> Title 22 CCR 66262.34(a)(1) releases. <br /> Post closure requirements apply to <br /> generators for applicable tanks and Title 22 CCR 67450.3(a)(11)(F)-TTU <br /> drip pads,and containment Title 22 CCR 67450.3(c)(9)(F)-PTU <br /> buildings. Post closure plan is required for tank <br /> Title 22 CCR 66265.197(61 systems. <br /> Post closure is required for tanks <br /> without secondary containment if <br /> all contaminated soils cannot be <br /> removed or decontaminated. <br /> Title 22 CCR 66265.445(c)(1)(B) <br /> Post closure plan is required for <br /> drip pads(w/o liners)from wood <br /> treatment facilities which do not <br /> comply with liner requirements <br /> pursuant to 66265.443(bx 1). <br /> Title 22 CCR 66265.1102(61 <br /> Post closure is required for <br /> containment buildings if all <br /> contaminated soils cannot be <br /> removed or decontaminated. <br /> 5 <br /> •r <br />