My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1412
>
2200 - Hazardous Waste Program
>
PR0220094
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2019 4:37:31 PM
Creation date
4/18/2019 10:56:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0220094
PE
2247
FACILITY_ID
FA0001479
FACILITY_NAME
SUMIDEN WIRE PRODUCTS CORPORATION
STREET_NUMBER
1412
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
117-360-40
CURRENT_STATUS
01
SITE_LOCATION
1412 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
660
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
not less than 60 days before commencing the first <br /> treatment of waste. (DTSC may shorten the time <br /> Eligible wastestreams and treatment processes are period between notification and authorization when <br /> limited to those listed in Title 22, CCR, Section 67450.11 the owner or operator shows good cause.) <br /> (abbreviated as§67450.11) as of January 1, 1992, plus <br /> technologies certified by DTSC pursuant to HSC In order to meet the notification requirement, you <br /> §25200.1.5. A listing of these wastestreams and treat- must submit a facility specific notification(DTSC Form <br /> ment processes is included in this fact sheet. 1772) and a unit specific notification_,(DTSC Form <br /> 1772D). These forms are available from DTSC's Re- <br /> You may only treat waste that you generate onsite gional or Headquarters offices. These forms are pe- <br /> and the waste must be treated in tanks or containers. riodically revised and were last changed in January <br /> 1996. <br /> • You may not treat waste that is a reactive or an ex- <br /> tremely hazardous waste, as defined in §66261.110 Each notification shall be completed, dated, and <br /> and §66261.113. signed according to the requirements of§66270.11 <br /> of Title 22, CCR. <br /> • You are not eligible for Permit by Rule (PBR) if the <br /> treatment activity requires a federal hazardous waste If mailed, the notification forms must be sent by <br /> treatment permit under the Resource Conservation Re- certified mail,with return receipt requested. You may <br /> covery Act (RCRA) program. also submit the forms in person. Currently, two sets <br /> of the notification must be submitted to the DTSC <br /> Treatment in the following units is ineligible-for Headquarters office in Sacramento and one set to <br /> PBR: the local enforcement agency. Please refer to Ap- <br /> pendix 2 of DTSC Onsite Hazardous Waste Treat- <br /> • landfills, ment Notification Form Instructions for the list of lo- <br /> • surface impoundments, cal enforcement agencies. You must also retain a <br /> • injection wells, copy of the latest notification form as part of your <br /> • waste piles, operating record. <br /> • land treatment units, and <br /> • thermal destruction units. Submit amended Forms 1772 and 1772D when- <br /> ever there is any change to the information contained <br /> Transportable Treatment Units: in the most recent notification submitted to the DTSC. <br /> TTUs can operate under PBR independent of the • You must also submit an annual PBR Notification <br /> generator's authorization status. TTU owners or op- by March 1 of each year following the first treatment <br /> erators wishing to operate directly under PBR, should of waste unless otherwise notified by the DTSC , and <br /> contact DTSC HQ for the appropriate notification forms. pay the annual fee when billed. DTSC will send all <br /> For additional guidance on TTUs please read the fact PBR facilities a renewal package in January of each <br /> sheet on Transportable Treatment Unit Operation un- year that list the facility's wastestream and treatment <br /> der Permit by Rule/Conditional Exemption. processes. Please indicate any change in opera- <br /> tion, sign and return to DTSC. <br /> . DTSC is in the process of writing regulations to <br /> REQUIREMENTS: transfer the notifications and authorization process <br /> OPERATINGfor the onsite tiers (PBR, Conditional Authorization <br /> If you intend to operate a FTU under the Permit by (CA), and Conditional Exemption(CE))to the CUPAs. <br /> Rule tier, you must comply with all of the following re- You will be notified by DTSC when this occurs. <br /> quirements. <br /> Notification: After January 1, 1997, please consult with your <br /> DTSC regional office and/or your local agency to <br /> If you plan to conduct a treatment activity that is determine if notification responsibility has moved <br /> eligible for PBR, you must submit a completed notifi- prior to submitting your notification. <br /> cation form to DTSC and the local enforcement agency <br />
The URL can be used to link to this page
Your browser does not support the video tag.