Laserfiche WebLink
FEE-25-2011 15 35 Service Station Systems 409 938 8888 P.07 <br /> 7. UNDER-DISPENSED CONTAINMENT (UDC) TESTING <br /> Test Method Developed By: ❑ UDC INfanufacturer M Industry Standard © Professional Engineer <br /> ❑ Other(Specify) <br /> Tcst Method Used: ❑ Pressure ❑ Vacuum M Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Incon Sump Tester Equipment Resolution: +/-0.002" <br /> I � � an r ar ani. oxen ru si.,.n, i. t t r e. •,.� s.. <br /> UDC#1/2 UDC#314 UDC#5/6 E UDC# 7/8 <br /> UDC Manufacturer: Bravo Bravo Bravo Bravo <br /> UDC Material: Steel steel Steel Steel <br /> UDC Depth: 12" 12" 125' 12" <br /> Height from UDC Bottom to Top Bottom Bottom Bottom Bottom <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to Bottom Bottom Bottom Bottom <br /> lowest Electrical Penetration: <br /> Condition of UDC prior to Good Good Good Good <br /> testing: _ <br /> Portion of UDC Tested 2"above piping 2" above i ung ��2"above iping 2"above pipino <br /> Does turbine shut down when <br /> UDC sensor detects liquid (both ❑ Yes ❑No ®NA [] Yes ❑No ®NA ❑ Yes[J No ®NA ❑ Yes ❑No ®NA <br /> product and water)?* _ <br /> Turbine shutdown response time N/A N/A N/AN/A <br /> Is system programmed for fail- I ❑ Yes ❑No ®NA ❑ Yes❑No ®NA C1 Yes ❑No ®NA ❑Yes ❑No ®NA <br /> safe shutdown?* <br /> Was fail-safe verified to be ❑ Yes p No ®NA ❑ Yes❑No ®NA ❑ Yes [3 No �1A ❑ Yes C] No ®NA <br /> n erationalf <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> starting test - <br /> Test Start Time: f 12:09 m 12:09 pm 1:14 pm 1:14 to <br /> initial Readin (R,): <br /> 6.7854 5.0171 3.5967 1.5605 <br /> Test End Time: 12:24 pm 12:24 pm 1:29 pm 1:29 pin <br /> Final Reading(RF): 6,7855 5,0172 3.5966 1,5605 <br /> Test Duration: 1.5 min 15 min 15 min 15 min <br /> Change in Reading(RF-R,): � �00001 +0.0001 -0.0001None <br /> Pass/Fail Threshold or Criteria: i +/-0100211 +/-0.002" +/-0.002" +/-0.00211 <br /> Test Result: f—xl Pass ❑ Fail 1] Pass ❑ Fail ® Pass C) Fail _® Pass ❑ Fail <br /> Was sensor removed for testing? ❑Yes ❑No ® NA _❑Yes ❑No ® NA pYcs ❑No ® NA ❑Yes❑No® NA <br /> Was sensor properly replaced and ❑Yes ❑No ®NA W W❑ Yes 0 No ®NA ❑Yes❑No Zl NA 0Yes ❑No®NA <br /> verified functional after testin? <br /> Com ments— (include information an repairs made prior to testin,K, and recommended follow-up for failed tests) <br /> "Sensor functionality was not confirmed. This procedure is not part of the Secondary Containment testing scope of work". <br /> If the entire depth of the UDC is not tested, specify how much was tested. if the answer to anv of the questions indicated with an <br /> asterisk(*) is"NO"or"NA",the entire UDC mist be tested. (See SWRCB LG-160) <br />