Laserfiche WebLink
SB`d -ld101 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer Industry Standard ❑Professional Engineer <br /> M Other(Q-5e ) <br /> Test Method Used: p Pressure p Vacuum <br /> (Specify) <br /> ® Hydrostatic <br /> Other eci <br /> Test Equipment Used: lncon Sump Tester <br /> Equipment Resolution: +1.0,002" <br /> - STP Sump#87 � STP Sump#89 STP Sump#91 <br /> Sump Diameter: 42" 42" 42" <br /> Sump Depth: 63" 63" 64" <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of <br /> Highest Pi in Penetration: <br /> 16" 19" 23" <br /> Height from Tank Top to Lowest <br /> 17" 18" i 17" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Good Good Good <br /> Portion of Sump Tested' 2"above piping 2" above piping 2" above piping <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑ Yes[]No ®NA ❑ Yes p No SNA ❑ Yes D No ONA <br /> -productand water)?.___ <br /> Turbine shutdown response time N/A N/A N/A <br /> Is system programmed for fail-safe <br /> shutdown?- Yes[jNo ®NA [IYes M No ®NA [3Yes ❑No ®NA <br /> Was fail-safe verified to be <br /> o erational?' ❑Yes 13 No ®NA � ❑Yes❑No ®NA [J Yes O No ®NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 30 minutes 30 minutes 30 minutes <br /> test: <br /> Test Start Time: <br /> Initial Reading(Ri): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-Rj): <br /> Pass/Fail Threshold or Criteria: <br /> c Test Result: 0 Pass © Fail ❑Pass 1l Fail 18 Pass ® Fail <br /> Was Sensor removed for testing? 1. ❑Yes Q No 0 NA [jYes 0 No ®NA []Yes ❑No M NA <br /> Was sensor properly replaced and ❑ Yes p No®NA ❑Yes ❑No®NA [J Yes []No®NA <br /> verified functional after testin ? <br /> Comments—lrnc'ludc�irrfOrirratron nn repairs made prioY to tesliir�, and recommended follow-up for failed tesisJ <br /> "Sensor functionality was not confirmed. This procedure is not part of the Secondary Containment testing scope of work". <br /> Unable to test due to torn test boots <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to agM of the questions indicated with an <br /> asterisk(*)is"NO" or"NA",the entire sump must be tested. (See SWRCB LG-160) <br /> su�a�sFiS uot'�pI-S aot "aS SE:TT TToE—SZ—Nnf <br /> Sa'd 8888 826 Bab <br />