My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
2300 - Underground Storage Tank Program
>
PR0231948
>
COMPLIANCE INFO 2010 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2022 9:57:59 AM
Creation date
4/29/2019 11:40:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2012
RECORD_ID
PR0231948
PE
2361
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SHELL) 68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
01
SITE_LOCATION
2448 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
363
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. SECONDARY PIPE TESTING <br /> Test Method Developed By: p Piping Manufacturer 0 Industry Standard p Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ® Pressure p Vacuum [] Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Test reducer boots,Nitrogen and gauges Equipment Resolution: 0.5% of span <br /> Piping Run#87 Piping Run X189 Piping Run#91 <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: 100' 100, 100, <br /> Product Stored: Gasoline Gasoline Gasoline <br /> Method and location of Reducer Bouts/Fittings Reducer Boots/Finings Reducer Boots/Fittings <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10 minutes 10 minutes 10 minutes <br /> starting test: <br /> rest Start Time: <br /> Initial Reading(Rt): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: ❑Pass El Fail ❑Pass 0 Fail ❑Pass® Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Visual fail. All three test boots are cracked.Need 3 boots. <br /> Need(2)per 3.5 x 2.4 OSA <br /> Need(1)per 3.5 x 2.4 A <br /> Offset boots are for 89 and 91 lines <br /> PB'd 8888 82:6 80P swa�.Sns uot�p4S aotnjaS bz:ZZ TTOE2-2E—Nnf <br />
The URL can be used to link to this page
Your browser does not support the video tag.