Laserfiche WebLink
• The method of water level measurement will be with an audible sounding device and <br /> will be performed on the same quarterly schedule specified for the current monitoring <br /> and reporting program for the nearby well MW-6. Turbulence from pumping may <br /> - cause fluctuating water levels. If fluctuating levels are apparent, the average of three <br /> measurements collected at least 5 minutes apart will be used. <br /> 5.4 QA/QC Procedures <br /> One duplicate grab sample of the cuttings will be used for each test. <br /> 5.5 Time Schedule <br /> See Response 4 <br /> 6. Comment 3 <br /> The work plan should include a health and safety plan. <br /> 7. Response 3 <br /> See Appendix A: health and Safety Plan For Extraction Well Construction. Triple <br /> - E Produce Facility, Tracy California. <br /> 8. Comment 4 <br /> The schedule should include the permitting process for disposal of the groundwater and a <br /> report evaluating the ground water extraction system. <br /> 9. Response 4 <br /> Requested items are shaded in the work schedule below <br /> Work Schedule : <br /> Activity Time <br /> Submit Operations Plan to Regional Board to Support the August/September, 1095 <br /> Report of Waste:Discharge Piled 7/17/95 <br /> ` <br /> Quarterly monitoring September, 1995 <br /> Receive Waste Discharge Requirements from Regional Board *October/December, 1995 <br /> Install XW-1 *October/December 1995 <br /> Monitor sustained pumping from XW-1 and disposal of excess November/ December, 1995 <br /> water from former rinse water pond <br /> Quarterly monitoring December, 1995 <br /> Quarterly monitoring March, 1996 <br /> Provide report evaluating" the groundwater extraction system Aril, 1996 <br /> *or sooner if WDR expedited by Regional Board <br /> 5 <br /> L wI CONDOR <br />