My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
8690
>
2900 - Site Mitigation Program
>
PR0009063
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 1:41:40 PM
Creation date
5/2/2019 1:23:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009063
PE
2960
FACILITY_ID
FA0003785
FACILITY_NAME
PACIFIC TRIPLE E LTD
STREET_NUMBER
8690
Direction
W
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
253-210-180-00
CURRENT_STATUS
01
SITE_LOCATION
8690 W LINNE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The method of water level measurement will be with an audible sounding device and <br /> will be performed on the same quarterly schedule specified for the current monitoring <br /> and reporting program for the nearby well MW-6. Turbulence from pumping may <br /> - cause fluctuating water levels. If fluctuating levels are apparent, the average of three <br /> measurements collected at least 5 minutes apart will be used. <br /> 5.4 QA/QC Procedures <br /> One duplicate grab sample of the cuttings will be used for each test. <br /> 5.5 Time Schedule <br /> See Response 4 <br /> 6. Comment 3 <br /> The work plan should include a health and safety plan. <br /> 7. Response 3 <br /> See Appendix A: health and Safety Plan For Extraction Well Construction. Triple <br /> - E Produce Facility, Tracy California. <br /> 8. Comment 4 <br /> The schedule should include the permitting process for disposal of the groundwater and a <br /> report evaluating the ground water extraction system. <br /> 9. Response 4 <br /> Requested items are shaded in the work schedule below <br /> Work Schedule : <br /> Activity Time <br /> Submit Operations Plan to Regional Board to Support the August/September, 1095 <br /> Report of Waste:Discharge Piled 7/17/95 <br /> ` <br /> Quarterly monitoring September, 1995 <br /> Receive Waste Discharge Requirements from Regional Board *October/December, 1995 <br /> Install XW-1 *October/December 1995 <br /> Monitor sustained pumping from XW-1 and disposal of excess November/ December, 1995 <br /> water from former rinse water pond <br /> Quarterly monitoring December, 1995 <br /> Quarterly monitoring March, 1996 <br /> Provide report evaluating" the groundwater extraction system Aril, 1996 <br /> *or sooner if WDR expedited by Regional Board <br /> 5 <br /> L wI CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.