Laserfiche WebLink
.. Weaw *-age Installation of XW-1 <br /> I lealth and Safety Plan,AUGUST,1993 <br /> 080911&S.DOC <br /> r <br /> SITE SAFETY PLAN (SSP) <br /> ADMINISTRATIVE INFORMATION <br /> Site Name: Triple E Produce Facility <br /> Site Location: Linne Road, Tracy, California <br /> Project Title: Installation of Groundwater Extraction Well XW-1 and Associated Piping and Electrical <br /> Equipment Near Existing Monitoring Well MW-6 <br /> Project Manager: Robert Dixon <br /> Company Health & Safety Officer: Ben White <br /> On Site Project Manager: John H. Kramer/ Gary Dymesich/Tom Lockhart <br /> On Site Field Manager: John H Kramer/Gary Dymesich Tom Lockhart <br /> On Site Health & Safety Officer: John H. Kramer/Gary Dymesich Tom Lockhart <br /> Alternate On Site Safety Officer:Marc Crum/Tom Lockhart <br /> Date: August 15, 1995 <br /> SSP Preparer: John H. Kramer <br /> Approved: e� <br /> Benjamin White <br /> Owner Contact : Tom Guido (209) 835-5123 <br /> (phone) <br /> A-2 <br /> — C1 CONDOR <br />