My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
8690
>
2900 - Site Mitigation Program
>
PR0009063
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 10:13:38 AM
Creation date
5/2/2019 1:24:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009063
PE
2960
FACILITY_ID
FA0003785
FACILITY_NAME
PACIFIC TRIPLE E LTD
STREET_NUMBER
8690
Direction
W
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
253-210-180-00
CURRENT_STATUS
01
SITE_LOCATION
8690 W LINNE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ground Water Monitoring Plan <br /> Triple E Produce Corporation <br /> Tracy, California <br /> Table 1. Parameters, Sample Type, Frequency, Method, and Sampling Points (Revised 9/11/96) <br /> Parameters Unils Type of Method Sampling Points <br /> Sample Frequency <br /> Ground Water Elevation n. Dated Weekly/Quarterly' Electric All Wells <br /> MSL measurement sounder <br /> Flow gpd Cumulative *Weekly/Monthly= Calibrated XW-1, MW-4A,&/or MW-2', <br /> Weekly/Quarterly container- fill Aeration/fere Pond,Treatment <br /> &estimate Plant <br /> Temperahire "C Grab Weekly/Quarterly Field All <br /> Tlicrmometcr <br /> pit pit std. Grab `Wcckly/Mon(hly' IiPA All <br /> Units Wcckly/Quarterly 150.1/9145 <br /> Electrical Conductivity µmhos/ Grab *Weekly/Monthly' EPA 120.1 All <br /> cm Weekly/Quarterly <br /> Total TIIMs µg/l Grab Weekly/Quarterly EPA 524.2 All <br /> IDS mg/I Grab Weekly/Quarterly EPA 160.1 All <br /> Standard Minerals 4- mg/I Grab Quarterly/Annually' t?PA 100, 200, All <br /> anion/cation balance 300 series <br /> * Schedule pertains to treatment Plant only. <br /> 1. Weekly sampling to be performed the first month ground water is extracted, then quarterly thereafter. <br /> 2. At the beginning of each year's discharge to the apricot orchard spray field, the treatment plant effluent shall be <br /> sample weekly the first month of operation, then monthly thereafter. <br /> 3. Quarterly sample will be collected during the first year of extraction, then annually thereafter. <br /> 4. Monitoring well MW-2, which is piped as part of the bioremediation program, may be used as an alternate to <br /> extraction well MW-4A, if operations conditions require this change. <br /> F:\PROJ ECT\0809\RPT\GW M PTb 1 rev.doc <br /> t, CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.