My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1130
>
3500 - Local Oversight Program
>
PR0544417
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 1:41:17 PM
Creation date
5/2/2019 1:40:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544417
PE
3528
FACILITY_ID
FA0003741
FACILITY_NAME
JIFFY LUBE #598
STREET_NUMBER
1130
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
15120405
CURRENT_STATUS
02
SITE_LOCATION
1130 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Workplan- Soil Boring Investigation BSK No. 07-4-00230 <br /> 1130 N. Main Street November 29, 1999 <br /> Manteca, California Page 3 <br /> SCHEDULE <br /> BSK will begin permitting activities within 5 days of receipt of verbal workplan authorization. <br /> Drilling will be scheduled after approval of the drilling permit. 'We anticipate drilling will be <br /> completed within one week of permit approval. Analytical laboratory tests will be scheduled on <br /> a standard turnaround basis. We anticipate that the report will be provided to you within three <br /> weeks of completion of the field investigation. <br /> CLOSING <br /> We appreciate the opportunity to assist you with the site investigation. Should you have any <br /> questions regarding the workplan,please do not hesitate to call us. <br /> Sincerely, <br /> V �Cc� BSK&Associates i <br /> No. EG 1452 <br /> P. � � � Richard E. Johnson CEG <br /> �'OLO Manager, Environmental Services <br /> REJ:JGY <br /> Attachment: Site-Specific Health and Safety Plan <br /> Distribution: <br /> Mr. Kevin Post,URSA Engineering(1 original, 1 copy) <br /> Ms. Kevin Wong,PHS-EHD (1 copy) <br />
The URL can be used to link to this page
Your browser does not support the video tag.