Laserfiche WebLink
Workplan- Soil Boring Investigation BSK No. 07-4-00230 <br /> 1130 N. Main Street November 29, 1999 <br /> Manteca, California Page 3 <br /> SCHEDULE <br /> BSK will begin permitting activities within 5 days of receipt of verbal workplan authorization. <br /> Drilling will be scheduled after approval of the drilling permit. 'We anticipate drilling will be <br /> completed within one week of permit approval. Analytical laboratory tests will be scheduled on <br /> a standard turnaround basis. We anticipate that the report will be provided to you within three <br /> weeks of completion of the field investigation. <br /> CLOSING <br /> We appreciate the opportunity to assist you with the site investigation. Should you have any <br /> questions regarding the workplan,please do not hesitate to call us. <br /> Sincerely, <br /> V �Cc� BSK&Associates i <br /> No. EG 1452 <br /> P. � � � Richard E. Johnson CEG <br /> �'OLO Manager, Environmental Services <br /> REJ:JGY <br /> Attachment: Site-Specific Health and Safety Plan <br /> Distribution: <br /> Mr. Kevin Post,URSA Engineering(1 original, 1 copy) <br /> Ms. Kevin Wong,PHS-EHD (1 copy) <br />