My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOFFAT
>
983
>
2300 - Underground Storage Tank Program
>
PR0231691
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 4:47:22 PM
Creation date
5/2/2019 3:57:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0231691
PE
2361
FACILITY_ID
FA0003593
FACILITY_NAME
Nella Oil #487
STREET_NUMBER
983
STREET_NAME
MOFFAT
STREET_TYPE
Blvd
City
Manteca
Zip
95336
APN
221-15-06
CURRENT_STATUS
01
SITE_LOCATION
983 Moffat Blvd
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANJ O A Q U I N Environmental Health Department <br /> COU NTY-- <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans &applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES [] NON <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training <br /> certificates for each person installing or testing any component that is repaired or replaced. Ensure a copy of <br /> the"Site Health and Safety Plan" is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a <br /> diagram drawn to scale showing location of repairs and/or replacements. If repairing a component, describe <br /> how this will be done. (If adding piping, UDC's, or other UST equipment, or performing tank top upgrade, <br /> use the UST Installation Application pages 4-8 as necessary for a timely plan review).- <br /> Provide <br /> eview):Provide labor and tools to remove 5 existing dispensers.(existing dispensers to remain on site for owners) <br /> Provide and install 5 UDC conversion frames. Install 5 owner supplied dispensers. Provide industry certified <br /> electrician and technician for hook up and programming of new dispensers. Purge and calibrate dispensers and <br /> assure system functionality. Provide and install Bravo deflection plates allowing extra coverage for fuel filter <br /> assembliess for Gasboy dispensers. <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> Bavo conversion frames(br-conv-b200-opp) Bravo Deflection plates for Gasboy Dispensers <br /> Emco Wheaton balance nozzle package(eva4005evr-052) <br /> Owner Supplied Gasboy dispensers. <br /> 5. Decontamination Procedures: <br /> a. Will piping be decontaminated prior to removal? YES [] NO [} <br /> b. Identify contractor performing decontamination: <br /> Name N/A Phone ( ) <br /> Address City Zip <br /> 3of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.