My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
244
>
2900 - Site Mitigation Program
>
PR0506390
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 1:35:50 PM
Creation date
5/6/2019 1:23:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0506390
PE
2950
FACILITY_ID
FA0007389
FACILITY_NAME
MINI STOP
STREET_NUMBER
244
Direction
W
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
13708014
CURRENT_STATUS
01
SITE_LOCATION
244 W HARDING WAY
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. AIi -2- November 19, 2001 <br /> • The work products must be acceptable to the County. <br /> • If a different scope of work becomes necessary, then youmust request pre-approval of costs . <br /> on the new scope of work. <br /> • Although I have referred to the AGE proposal in my pre-approval above, please be aware <br /> that you will be entering into a private contract: the State of California cannot compel you to <br /> sign any specific.contract. <br /> I also want to remind you that the Fund's regulations require that you obtain at least three bids, <br /> mora bid-waiver`rrom Fuiid staff,'frorn qualified,firms:for.all necessary future.corrective action <br /> work. If you need assistance in procuring contractor and consultant services, don't hesitate to <br /> call me. . <br /> Please remember that it is still necessary to submit the actual costs of the work as.explained in <br /> the Reimbursement Reguest Instructions to confirm that the costs are consistent with this pre- <br /> approval before you will be reimbursed. Please insure that your coiisultantprepares their <br /> invoices to include the required breakdown!of costs on a time and materials basis, that <br /> invoiced tasks are consistent with the original proposal, and that reasonable explanations are <br /> 11 <br /> provided for any changes made in the scope.of work or increases in the costs.. When the <br /> invoices are submitted you must include copies of all: <br /> • subcontractor invoices, . <br /> • technical reports, when available, and <br /> • applicable correspondence from the County. _ <br /> Please call if you have any questions; I can be reached at (916) 341-5796. <br /> Sincerely, <br /> 6 <br /> Mark Owens, Water Resources Control Engineer <br /> Technical Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> Enclosure <br /> g t <br /> Il <br /> CarfornraEnvironmeuta/ProtecionlIgency <br /> �.pw RecydedPsper <br />
The URL can be used to link to this page
Your browser does not support the video tag.