My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0002714
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
244
>
2900 - Site Mitigation Program
>
PR0506390
>
ARCHIVED REPORTS XR0002714
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 2:21:21 PM
Creation date
5/6/2019 2:17:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002714
RECORD_ID
PR0506390
PE
2950
FACILITY_ID
FA0007389
FACILITY_NAME
MINI STOP
STREET_NUMBER
244
Direction
W
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
13708014
CURRENT_STATUS
01
SITE_LOCATION
244 W HARDING WAY
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Preliminary Site Assessment Report <br /> ` FAST AND EASYlMART ' <br /> r 244 West Harding Way, Stockton; California N <br /> 1.0. INTRODUCTION <br /> At the request of Mr.Mike Ali,Advanced GeoEnvironmental,Inc. (AGE)has prepared the enclosed <br /> Preliminary,;-Site Assessment"Report,for the property located at 244 West Harding"Way,'Stockton, <br /> California. The scope of work included advancement of three soil probe boring and preparation of <br /> this report. The location of the site is illustrated on Figure 1 and a plan of the.site is illustrated'on <br /> 1 Figure 2: . <br /> This report has been prepared in accordance with guidelines established by the Central Valley <br /> Regional Water Quality Control Board (CVRWQCB) for,'the subsurface• investigation 'of <br /> '., underground storage tank (UST) sites., Site background information'is provided in Appendix A. <br /> 2.0 PROCEDURES <br /> Field work Was conducted in accordance with guidelines established by the CVRWQCB for'the <br /> investigation of UST sites and.the San Joaquin County•Environmental Health Department (EHD) <br /> 1• for.sampling of ground water monitoring wells,. Soil boring installation and sampling procedures for <br /> the site were outlined in Site Assessment Work Plan dated 15 December 2000,prepared by AGE and <br /> approved by the EHD by letter dated 29 December 2002. ,- <br /> 2.1. <br /> 002. ,2.1. ADVANCEMENT,OF,SOIL PROBE BORING <br /> 1 1 July 2002 three soil robe boring. B3 B4 and BS were advanced to a total depth of 45 feet <br /> On 3 J y � , p g-{ � ) p , <br /> below surface grade(bsg)utilizing a van-mounted.Geoprobe'5400 direct-push probing unit'equipped ' <br /> with 1.25-inch diameter probing rods;the probing unit advances soil probe borings using a hydraulic <br /> hammer to drive soil and ground water sampling tools to ,specified depths. Two borings,were <br /> ;advanced east and west,respectively,of the former UST excavation; the third boring was advanced <br /> north of the former dispenser area. <br /> ' 2.2. SOIL SAMPLE COLLECTION <br /> _Discrete soil samples were collected using the Geoprobe push-driven 2-inch diameter soil-sampler <br /> fitted with four six-inch long brass sleeves at 5-foot intervals,beginning at 10 feet bsg. Soil samples <br /> were collected to a depth of 40 feet bsg in boring B3 and to a depth of 35 feet bsg in borings B4 and <br /> B5. <br />
The URL can be used to link to this page
Your browser does not support the video tag.