My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012718
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
140
>
3500 - Local Oversight Program
>
PR0544425
>
ARCHIVED REPORTS XR0012718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 3:04:54 PM
Creation date
5/6/2019 2:45:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012718
RECORD_ID
PR0544425
PE
3528
FACILITY_ID
FA0006249
FACILITY_NAME
VILLAGE PROPERTIES
STREET_NUMBER
140
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13707051
CURRENT_STATUS
02
SITE_LOCATION
140 HARDING WAY
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
360
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t. a <br /> F <br /> -- Project No. 90161.e <br /> 7 June 1990 <br /> Clear in stri in and re aration for mass radin <br /> 1. All existing abandoned structures, pavements and underground <br /> evelopment area should be removed. <br /> appurtenances within the d <br /> 2. Following removal of abandoned facilities and any <br /> ? ^ subexcavation of unsuitable materials, all depressions extending <br /> is <br /> below final grade should be processed properly and backfilled <br /> is <br /> � with compacted engineered fill. The adequacy of subexcavation , <br /> operations should be reviewed by the Geotechncial Engineer prior <br /> ;..-, to placement of fill materials and/or structures. The existing <br /> tank backfill materials encountered were potentially loose and <br /> foundations should <br /> adequacy for support of be verified during <br /> construction. After asphalt is removed field density testing of <br /> existing backfill materials should be conducted. <br /> Y <br /> f: <br /> ti 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.