My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012718
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
140
>
3500 - Local Oversight Program
>
PR0544425
>
ARCHIVED REPORTS XR0012718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 3:04:54 PM
Creation date
5/6/2019 2:45:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012718
RECORD_ID
PR0544425
PE
3528
FACILITY_ID
FA0006249
FACILITY_NAME
VILLAGE PROPERTIES
STREET_NUMBER
140
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13707051
CURRENT_STATUS
02
SITE_LOCATION
140 HARDING WAY
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
360
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V'R <br /> ,�. Project No. 90161.e <br /> 7 Sune 1990 <br /> ''' Under round Facilities Construction <br /> j . <br /> 1. Trenches greater than 5 feet in dapth should be provided with <br /> Lad <br /> E : <br /> shoring or sloped back at a 1:1 slope in accordance with Cal-osha <br /> regulations. <br /> t . <br /> F 2, It is-suggested that native soil be used for backfill within <br /> structural areas and for five feet beyond the building footprints <br /> Asa <br /> E ; <br /> to inhibit rapid lateral migration of drainage and irrigation <br /> Beo <br /> nd the 5 <br /> foot distance, on-site or import soil may <br /> waters. y <br /> '.; be used. A lean corcret trench plug may also be utilized at the <br /> foundation line to achieve the desired results- Compaction of i <br /> E <br /> tcs <br /> E _ <br /> the backfill should be by mechanical methods. Jetting is not <br /> j recommended. <br /> i:3 3. All soil backfill, placed after the underground facilities <br /> 1 have been installed, should be compacted to the same compaction <br /> >a <br /> as the surrounding soil within the structural areas and 85% in <br /> ompaction should be accomplished using lifts <br /> landscaped areas. C <br /> which da not exceed 8 inches, however, thickness of the lift <br /> should be determined by the contractor and if a thicker lift is <br /> desired, and he can achieve the required compaction, the method <br /> will be acceptable. <br /> U. <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.