Laserfiche WebLink
Project Na. go 161.e <br /> 7 dune 1990 <br /> General construction re irements <br /> 1. All final grades should be provided with a positive drainage <br /> ,a provide rapid <br /> gradient away from all foundations in order to <br /> removal of surface water runoff, <br /> to an adequate discharge <br /> sfacility. Ponding of water should not be allowed on building <br /> pads or adjacent to foundations. Roof downspouts should be <br /> i <br /> provided and tied into an appropriate discharge facility. <br /> �s <br /> i <br /> — <br /> 17 <br />