My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012718
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
140
>
3500 - Local Oversight Program
>
PR0544425
>
ARCHIVED REPORTS XR0012718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 3:04:54 PM
Creation date
5/6/2019 2:45:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012718
RECORD_ID
PR0544425
PE
3528
FACILITY_ID
FA0006249
FACILITY_NAME
VILLAGE PROPERTIES
STREET_NUMBER
140
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13707051
CURRENT_STATUS
02
SITE_LOCATION
140 HARDING WAY
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
360
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> Project No. 90161.e <br /> 7 June 1990 <br /> without the full knowledge and without field observation and <br /> ` testing by representatives of XCUNGDAHL & ASSOCIATES, INC. , will <br /> be at the contractor's risk and no responsibility will be <br /> accepted on the part of YOUNGDAHL & ASSOCIATES, INC. <br /> t:a <br /> 1.15 Contents of these specifications shall be integrated with <br /> !A the geotechnical engineering study of which they are a part. They <br /> shall not be used as a self-contained document. <br /> �. 2.1 Tests <br /> 2.11 The standard test used to define maximum densities of all <br /> compaction work shall be the ASTM Test Procedure D1557-78. All <br /> densities shall be expressed as a relative compaction in terms of <br /> M the maximum dry density determined in the laboratory by the <br /> foregoing standard procedure. <br /> 3.1 Clearin nubbin and re arin areas to be filled <br /> F� 3.11 All vegetative matter and organic topsoil shall be removed <br /> from all structural areas. The depth of organic topsoil to be <br /> removed will be determined in the field by the Geotechnical <br /> Engineer, but, in general, will vary from 0 to 2 inches. <br /> 3.12 All soil deemed soft or unsuitable by the Geotechnical <br /> Engineer scall be removed. <br /> 3.13 All underground structures shall be removed from the site <br /> such as old foundations, abandoned pipe lines, septic tanks and T-- -- <br /> leach fields. <br /> 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.