My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012718
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
140
>
3500 - Local Oversight Program
>
PR0544425
>
ARCHIVED REPORTS XR0012718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 3:04:54 PM
Creation date
5/6/2019 2:45:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012718
RECORD_ID
PR0544425
PE
3528
FACILITY_ID
FA0006249
FACILITY_NAME
VILLAGE PROPERTIES
STREET_NUMBER
140
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13707051
CURRENT_STATUS
02
SITE_LOCATION
140 HARDING WAY
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
360
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> MOMS <br /> project NO. 90161.e <br /> 7 June 1990 <br /> 4.12 Should import material be required, it must be approved by <br /> the Geotechnical Engineer prior to transporting it to the project <br /> and it must meet the following requirements: <br /> 1. Plasticity index not to exceed 12. <br /> 2. u1er-value not less than 25. <br /> 3. Should not contain rocks larger than 6 inches in maximum <br /> e-= <br /> size. <br /> 4. Not more than 15% passing the no. 200 sieve. <br /> > import material meeting the above requirements should be <br /> compacted to 9o% of the maximum dry density as determined by :ASTM <br /> Test Method D1557-78. <br /> material <br /> ,_4 5,1 Placin s read in and com actin fill <br /> 5.11 The till materials shall be placed in uniform lifts of not <br /> more than 5 inches in uneompacted thickness. Each layer shall be <br /> spread evenly and shall be thoroughly blade mixed during the <br /> spreading to achieve uniformity of material in each layer. <br /> ill shall be brought to a water <br /> Before compaction begins, the f <br /> - either 1} aerating <br /> content that will permit proper compaction by <br /> - saturated; or 2} spraying the material with <br /> the material if it is <br /> water if it is dry. <br /> ---- - -- - <br /> laced, mixed and spread evenly, <br /> --_ 5.3.2 -After-each layer--has been <br /> placed,- - -- - -- ------- -- <br /> actionat a <br /> it shall be compacted to at least 94% relative comp ' <br /> mfor low to non-expansive soils <br /> moisture content above optimum . <br /> 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.