My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012718
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
140
>
3500 - Local Oversight Program
>
PR0544425
>
ARCHIVED REPORTS XR0012718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 3:04:54 PM
Creation date
5/6/2019 2:45:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012718
RECORD_ID
PR0544425
PE
3528
FACILITY_ID
FA0006249
FACILITY_NAME
VILLAGE PROPERTIES
STREET_NUMBER
140
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13707051
CURRENT_STATUS
02
SITE_LOCATION
140 HARDING WAY
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
360
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> Project NO- 90161.e <br /> 7 June 1990 <br /> Soil which has been soaked and wetted by rain or other causes, <br /> shall not be compacted until completely drained and until the <br /> ore described. <br /> moisture content is within the liMits hereinbef <br /> e obtained <br /> Prior approval by <br /> the Geotechnical Engineer shall b <br /> before continuing the grading operations. <br /> 5.16 Fill slopes shall be compacted by <br /> means of sheepsfoot <br /> t. Y ui ment or the should be over-built <br /> rollers or other suitable eq P operations <br /> and cut back into compacted material. compacting <br /> �.� While no <br /> shall be continued until the slopes are stable. <br /> t.. a reciable amount of loose soil will be permitted on the slopes, <br /> PP <br /> rohibit planting. <br /> compaction shall not be so dense as to P <br /> be <br /> Compdone progressively in increments <br /> F acting of the slopes may <br /> tz <br /> of three to five feet in fill height or after the fill is brought <br /> to its total height. <br /> t � <br /> i' backfill <br /> 6,1 �3tilit ��— perimeter <br /> Where any opening is made under or through the <br /> 6.11 s must be <br /> ` ch items as <br /> foundations for suutility lines, the opening <br /> prevent the possible <br /> resealed so that they are watertight to prew <br /> entrance of outside irrigation or rain water into the underneath <br /> trenches extending under <br /> portion of the structures. The utility <br /> the perimeter foundations and concrete slabs-on-g <br /> rade floors <br /> Y d with native engineered fill and adequately <br /> shall be backfille <br /> compacted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.