Laserfiche WebLink
i, <br /> TreadWWOR6110 <br /> Mr. Jeffery Wong <br /> San Joaquin County Environmental Division <br /> 5 January 2004 <br /> Page 4 <br /> i <br /> of being able to continue groundwater remediation during the planned site redevelopment. After site <br /> construction, groundwater monitoring will continue in this.area as required by the SJCEHD, and the <br /> effectiveness of the ORC will be reevaluated. <br /> SCHEDULE <br /> Above ground demolition (down to building foundations) is scheduled to begin,during late <br /> January 2004, to be followed by subsurface demolition in March 2004. The subisurface <br /> demolition will involve removing all building foundations, subsurface utilities, and likely <br /> reworking the top 20 to 48-inches ',of the surface at the site. We anticipate that the ORC injection <br /> program would be performed after the subsurface demolition is completed in March 2004. <br /> is <br /> If you have any questions regarding this workplan please call. <br /> Sincerely yours, <br /> TREADWELL &ROLLO, INC. <br /> David G. Dixon, RG Philip G. Smith, REA II, CPG' <br /> Senior Project Manager Principal <br /> 25971008.DGD <br /> Attachments: Figure 1 —Proposed ORC Injection Points <br /> cc: Lorraine Islas - City of Stockton Mayors Office <br /> Kitty Walker- Stockton Housing and Redevelopment Department <br /> i. <br /> 1 <br /> I <br />