Laserfiche WebLink
MW-20A <br /> MW-20B <br /> � <br /> EW-2� ' <br /> ■ <br /> ■ <br /> • <br /> GP-37 • <br /> ■ <br /> #' GP-36 <br /> Former Tank No. 8 • <br /> GPP-3MW-21A <br /> ■ MW-21B <br /> • EW-1 f <br /> GP4 iG�-1 - GP-2 <br /> I + �- --J <br /> MW-25 ■ <br /> MW-19A +GP-3 <br /> MW-19B <br /> LINDSAY STREET <br /> EXPLANATION <br /> MW-3 Approximate location of monitoring well <br /> 15113-5 Approximate location of soil boring by Treadwell&Rollo, Inc., 1999 <br /> GP-1+ Approximate location of geoprobe or boring by <br /> Advanced GeoEnvironmental, Inc. <br /> EW-1 + Approximate location of water extraction well <br /> SB-2 o Approximate location of air sparging well 0 20 Feet <br /> ——————— Outline of former buildings I <br /> — Parcel boundary Approximate scale <br /> ■ Proposed Oxygen Releasing Compound (ORC) Injection Point <br /> 0 <br /> w Reference: Basemap from Siegfried Engineering,Inc.,1999. <br /> NORTH SHORE AREA 15 <br /> o ENVIRONMENTAL SERVICES-STOCKTON HOUSING CHASE CHEVROLET <br /> QStockton, California <br /> N I AND REDEVELOPMENT DEPARTMENT 423 NORTH MADISON STREET <br /> PROPOSED ORC INJECTION LOCATIONS <br /> a Trea&WaWW10 Date 01/05/04 Project No. 2597.09 Figure 1 <br /> I' <br />