My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
3408
>
2300 - Underground Storage Tank Program
>
PR0517521
>
COMPLIANCE INFO 2010 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 3:39:19 PM
Creation date
5/7/2019 10:21:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2018
RECORD_ID
PR0517521
PE
2361
FACILITY_ID
FA0013484
FACILITY_NAME
FOOD 4 LESS FUEL CENTER*
STREET_NUMBER
3408
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16422011
CURRENT_STATUS
01
SITE_LOCATION
3408 MANTHEY RD
P_LOCATION
01
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-GE <br /> . � I <br /> ,,AN 0 � 7;51r, <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer ® industry Standard ❑ Pro <br /> r_e:Tt— _�++CTI1�� r1- <br /> ❑ Other(Specify) J: <br /> Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other(Speci) <br /> Test Equipment Used: Test reducer boots,Nitrogen and gauges Equipment Resolution:0.5%of span <br /> i <br /> Piping Run#87 Piping Run#91 <br /> Piping Material: Poly Poly <br /> Piping Manufacturer: OPW OPW <br /> Piping Diameter: 2" 2" <br /> Length of Piping Run: 100' 100' <br /> Product Stored: Gasoline Gasoline <br /> Method and location of Reducer Boots/Fittings Reducer Boots/Fittings <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10 minutes 10 minutes <br /> starting test: <br /> Test Start Time: 11:45 am 11:45 am <br /> Initial Reading(Rj): 5 psi 5 psi <br /> Test End Time: 12:45 pm 12:45 pm <br /> Final Reading(Rr): 5 psi 5 psi <br /> Test Duration: 1 hr. I hr. <br /> Change in Reading(RF-R[): None None <br /> Pass/Fail Threshold or No detectable Loss No detectable Loss <br /> Criteria: <br /> Test Result: © Pass ❑Fail © Pass ❑ Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Torn boots, repairs made installed new test boots to 87 and 91 lines. <br />
The URL can be used to link to this page
Your browser does not support the video tag.