Laserfiche WebLink
-GE <br /> . � I <br /> ,,AN 0 � 7;51r, <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer ® industry Standard ❑ Pro <br /> r_e:Tt— _�++CTI1�� r1- <br /> ❑ Other(Specify) J: <br /> Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other(Speci) <br /> Test Equipment Used: Test reducer boots,Nitrogen and gauges Equipment Resolution:0.5%of span <br /> i <br /> Piping Run#87 Piping Run#91 <br /> Piping Material: Poly Poly <br /> Piping Manufacturer: OPW OPW <br /> Piping Diameter: 2" 2" <br /> Length of Piping Run: 100' 100' <br /> Product Stored: Gasoline Gasoline <br /> Method and location of Reducer Boots/Fittings Reducer Boots/Fittings <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10 minutes 10 minutes <br /> starting test: <br /> Test Start Time: 11:45 am 11:45 am <br /> Initial Reading(Rj): 5 psi 5 psi <br /> Test End Time: 12:45 pm 12:45 pm <br /> Final Reading(Rr): 5 psi 5 psi <br /> Test Duration: 1 hr. I hr. <br /> Change in Reading(RF-R[): None None <br /> Pass/Fail Threshold or No detectable Loss No detectable Loss <br /> Criteria: <br /> Test Result: © Pass ❑Fail © Pass ❑ Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Torn boots, repairs made installed new test boots to 87 and 91 lines. <br />