Laserfiche WebLink
JEAN 2016 <br /> 8. UNDER-DISPENSER CONTAINMENT (t1DC)TFSTI'NG -- I ] 1� <br /> Test Method Developed By: ❑ UDC Manufacturer ® Industry Standard ❑ ProfessicMEITuTlrlc�Et1-'"�T�" 'F <br /> ❑ Other(Spec{h,) <br /> Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> ❑ Other(Specify/ <br /> Test Equipment Used: Incon Sump Tester Equipment Resolution: +/-0.002" <br /> UDC#9/10 <br /> UDC Manufacturer: OPW <br /> UDC Material: Fiberglass <br /> UDC Depth: 31" <br /> Height from UDC Bottom to Top <br /> 12" <br /> of Hi hest Piping Penetration: <br /> Height from UDC Bottom to 4,. <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Good <br /> testing: <br /> Portion of UDC Tested 2"above piping <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑ Yes ❑No ®NA <br /> product and water)?* <br /> Turbine shutdown response time N/A <br /> Is system programmed for fail- ❑ Yes❑No ®NA <br /> safe shutdown'.). <br /> Was fail-safe verified to be ❑ Yes ❑No ®NA <br /> o erational?' <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes <br /> starting test <br /> Test Start Time: 2:16 pm <br /> Initial Reading(Ri): 2.8066 <br /> Test End Time: 2:31 pin <br /> Final Reading(Rt): 3.8064 <br /> Test Duration: 15 min. <br /> Change in Reading(RF-Ri): 0.0002 <br /> Pass/Fail Threshold or Criteria: +/-0.002" <br /> Test Result: 111 Pass 0 Fail <br /> Was sensor removed for testins? ®Yes❑No❑NA <br /> Was sensor properly replaced and ®Yes ❑No❑NA <br /> verified ftutctional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up.foi failed tests) <br /> "Sensor functionality was not confirmed.This procedure is not part of the Secondary Containment testing scope of work". <br /> If the entire depth of the UDC is not tested.specify how much was tested. If the answer to a�of the questions indicated with an <br /> asterisk(*)is"NO"or"NA".the entire UDC must be tested. (See SWRCB LG-160) <br />