Laserfiche WebLink
Task 12- Geotracker Submission <br /> This task will be to submit the site to the State Water Resources Control <br /> Board inventory of electronically cataloged sites in accordance with State <br /> of California directives <br /> 10. EQUIPMENT DECONTAMINATION PROCEDURES Sampling equipment will be <br /> decontaminated using a non-phosphate, soap and water wash, a tap water rinse, and two <br /> distilled, deiomzed water rinses The hollow-stem auger will be decontaminated in a <br /> similar manner before and after advancing the soil boring <br /> 11. WASTE DISPOSAL PROCEDURES The cuttings from the soil boring and the purge <br /> water will be containerized in 55-gallon Department of Transportation-approved drums <br /> pending laboratory analytical results If contaminated, the waste will be hauled off site for <br /> disposal at an appropriate facility <br /> 12. EMERGENCY OR INTERIM CLEANUP: Not applicable <br /> 13. WORK SCHEDULE A pre-approval request to the SWRCB-DFA will be submitted <br /> within ten (10) days after approval of this Work Plan by the PHSEHD Field work <br /> contained in the workplan will begin within thirty (30) days after pre-approval has been <br /> . obtained from the SWRCB-DFA The PHSEHD will be notified at least 48 hours before <br /> any on-site work commences <br /> Mam\D\Environmental\ParmarTexaco\Workplan\042003 wpd 17 <br />