My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001833
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
521
>
3500 - Local Oversight Program
>
PR0544430
>
ARCHIVED REPORTS XR0001833
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 2:30:41 PM
Creation date
5/7/2019 2:18:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001833
RECORD_ID
PR0544430
PE
3526
FACILITY_ID
FA0005370
FACILITY_NAME
PARMAR TEXACO
STREET_NUMBER
521
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
521 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
covered with plates and/or backfilled <br /> The minimum hole clearance depths are 4 feet below ground surface (bgs) outside the critical <br /> zone and 8 feet bgs within the critical zone and are conducted as follows <br /> • 0 to 4 bgs The area to be cleared exceeds the diameter of the largest tool to be <br /> advanced and is sufficiently large enough to allow for visual inspection of any <br /> obstructions encountered The first I to 2 feet is delineated by hand digging to <br /> remove the soil, then the delineated area is probed to ensure that no obstructions <br /> exist anywhere near the potential path of the drill auger or push-type sampler <br /> Probing is extended laterally as far as possible Hand augering or post-hole <br /> digging then proceeds, but only to the depth that has been probed If subsurface <br /> characteristics prohibit effective probing, a hand auger is carefully advanced past <br /> the point of probing In this case, sufficient hand augering or post-hole digging is <br /> performed to remove all the soil in the area to be delineated For soil borings <br /> located outside of the critical zone, an attempt should be made to probe an <br /> additional 4 feet <br /> • 4 to 8 bgs For the soil borings located inside the critical zone, probing and hand <br /> clearing an additional 4 feet is performed If probing is met with refusal, then <br /> trained personnel advance a hand auger without excessive force An alternate or <br /> additional subsurface clearance procedures may also be employed, as required by <br /> clients, permit conditions, and/or anticipated subsurface conditions (for example, <br /> near mayor utility corridors or in hard soils) Alternate clearance techniques may <br /> include performing a geophysical investigation or using an air knife or water <br /> knife If subsurface conditions prevent adequate subsurface clearance, the drilling <br /> operation is ceased until the client approves a procedure for proceeding in writing <br /> If any portion of the UST system is encountered, or if there is any possibility that <br /> it has been encountered, the work ceases, and the client is notified immediately If <br /> there is reason to believe that the product system has been damaged, the <br /> emergency shut-off switch is activated The client will decide if additional <br /> uncovering by hand is required If it is confirmed that the UST system has been <br /> encountered, tightness tests are performed The hole is backfilled only with client <br /> approval <br /> Main\D\Envuonmental\ParmarTexaco\Workplan\D42003 wpd 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.