Laserfiche WebLink
10 40 209 3683433 FIFTH FLOOR <br /> 03/29/2002 21 50 FAX <br /> PAGE 03 <br /> f L900 <br /> Taskt ]SiLiYE Receptor Survey to a radius of �feet of d-,g- <br /> . site t4 insist in <br /> detemining r6lative risk to public health and safery from the unauthorized <br /> petrolourn hydcocarbort release at the sttc. <br /> Task 4: Site Conceptual Model of peatrolourn bydrocarbor: corrtalminacion, <br /> sulbburfmt geologic conditions, groundwater flow du=tjon and gradient; <br /> and sensttnre receptors <br /> Task 5: Sut►missIc'n of Quarterly Status Reports (QSR) and Quarterly MaDljoring <br /> RePmU (QMR)to PHSERD until otherwise dueeted. <br /> Ta,qk 6- Submis,%ion of site to SWRCB Geotmcker program <br /> Task 7- Prcpnrsdc" and submission of Expanded Site Aswswnsat and Intw= <br /> Retnedaal Action workplan to PHSEHD In accordance with Tri-Regional <br /> Boyd Guidelines for Underground Storage Tank investigations. <br /> TJ"s effort is to allow the rapid cmmladon of older and new data and to determine whAt scope of <br /> work should be included in the expanded site assessment woftlarn. We anocipate submitted a <br /> formai warkplau to PHSEHD within Ihe~next shirty days. Tf you have any questions please do not <br /> hesitate to cant=roe at(209) 369-9421. TbAnk you vety Much <br /> SsnL�ly, gj <br /> Sieph G.Muir <br /> Certified Engmeeermg Geologist#1224 3�0 <br /> EV'ratron Date; 08/30/03 ` <br /> The above referenced techmcal scope of work to dnrecring Mr. Stephen G_Muir to develop an <br /> expanded este assessment and interim remedial action workplan is approved. <br /> Hy: <br /> Hearlaa K1ofl <br /> San 1024um County Public He91rh Services- )Environ smt W Hertlth D? v)sran <br /> A44,&4 f 5 a <br /> Hate_ <br /> Ms�nnvuonnsene�IVra�marTco�Re0317Q3ts wF,d 2 <br />