My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001833
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
521
>
3500 - Local Oversight Program
>
PR0544430
>
ARCHIVED REPORTS XR0001833
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 2:30:41 PM
Creation date
5/7/2019 2:18:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001833
RECORD_ID
PR0544430
PE
3526
FACILITY_ID
FA0005370
FACILITY_NAME
PARMAR TEXACO
STREET_NUMBER
521
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
521 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> .l <br /> ATTACHMENT 2 <br /> WORKER HEALTH AND SAFETY PLAN FOR UNDERGROUND STORAGE TANK INVESTIGATIONS <br /> SITE-SPECIFIC INFORMATION <br /> Site Address 521 North Cherokee Lane,Lodi, California <br /> Name of Business Occupying Site Coronas Fixin Tires <br /> Owner Name Mr Jose Garcia Telephone (209) 365-7672 <br /> PHSEHD Contact Mr Harlan Knoll Telephone (209) 468-3462 <br /> FIELD ACTIVITIES AND GOALS OF THIS INVESTIGATION Drill and sample 10 soil borings,convert 7 <br /> soil borings to 2"monitoring wells Purge and sample groundwater containing hazardous levels of gasoline and its <br /> constituents <br /> KNOWN HAZARDS AT THE SITE INCLUDE <br /> Gasoline hydrocarbons <br /> KEY PERSONNEL AND RESPONSIBILITIES <br /> NAME RESPONSIBILITIES <br /> Stephen G Muir,CEG SITE SAFETY OFFICER-Primarily responsible for site safety, <br /> response operations, and protection of the public Responsible for work <br /> site inspections to identify particular hazards and define site security <br /> (209) 369-9421 <br /> Stephen G Muir,CEG PROJECT MANAGER-Primarily responsible for site remediation <br /> The project manager delineates authority,coordinates activities and <br /> functions,and directs activities related to mitigative efforts of cleanup <br /> contractors <br /> Stephen G Muir,CEG SITE INVESTIGATIVE PERSONNEL-Primarily responsible for <br /> actual field work including sampling,monitoring,equipment use,and <br /> other related tasks as defined by the project manager <br /> ANT <br /> ICIPATED WEATHER CONDITIONS FOR THIS AREA DURING THE PROJECT'S DURATION WILL <br /> BE- <br /> Temp range 50-70 F Humidity 30-60%Ambient temp 60 F <br /> Potential for heat stress High _Medium_Low _X_ <br /> ANTICIPATED PROTECTION LEVEL DURING THIS PROJECT <br /> Level "D"Will be upgraded or downgraded to fit situations as they arise <br /> EMERGENCY INFORMATION <br /> All emergency calls 911 <br /> Closest hospital with emergency room Lodi Memorial Hospital-Lodi <br /> 975 South Fairmont Avenue,Lodi,California 95240(209) 334-3411 <br /> Map Showing Route from Site to Hospital Attached?Yes X No <br /> Main\D\Environmental\ParmarTexaco\Workplan\642001 wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.