My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001845
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
521
>
3500 - Local Oversight Program
>
PR0544430
>
ARCHIVED REPORTS XR0001845
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 2:29:31 PM
Creation date
5/7/2019 2:23:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001845
RECORD_ID
PR0544430
PE
3526
FACILITY_ID
FA0005370
FACILITY_NAME
PARMAR TEXACO
STREET_NUMBER
521
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
521 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure 6 depicts the location of the eight soil borings (PT-SB5 to 12) The soil borings completed by <br /> Earthtec Ltd were drilled with a 10 inch diameter continuous flite samples auger Soil les were recovered at five <br /> g p <br /> foot depth intervals and where pronounced lithologic changes were noted The B-53 drill used a modified <br /> California split spoon sampler that cut an 18 inch long sample was used with a slide hammer to collect <br /> undisturbed soil samples Soil samples were recovered in 6-inch long,2-inch diameter brass liners Following <br /> recovery, the liners were sealed with teflon sheets, plastic end caps, and tape Sampling equipment was <br /> cleaned with Alquinox and rinsed with distilled water between sample recoveries The samples were then <br /> labeled and preserved in a cooled ice chest. Pertinent data was recorded on both the sampling log and chain <br /> of custody document Procedures used to log and sample the individual soil bonngs are outlined in Appendix <br /> 11 Procedures used to collect groundwater grab samples and sample management are outlined in Appendix <br /> m <br /> Drilling was conducted under the direction of a onsite California certified engineering geologist who logged <br /> the borings in accordance with the Unified Soil Classification System(Tablet) Table 2 presents atabulation <br /> ofthe soil borings and monitoring wells drilled and sampled as well as a rationale for placement and summary <br /> of results Figure 6 depicts the locations of the soil borings and monitoring wells drilled during this element <br /> of site work <br /> Soil samples were screened in the field using a MiniRae 2000 photoionization detector(PID),serial number <br /> 4132 in order to provide a field determination of the presence of volatile organic compounds Logs of the <br /> individual soil borings and subsequent monitoring wells are presented in Appendix IV <br /> A total of fifty six (56) soil samples were collected from the soil borings and monitoring wells and <br /> forwarded onto Kiff Analytical for analysis Of these sample a total of thirty one (3 1) soil samples were <br /> requested to be analyzed by Kiff Analytical laboratory The other samples were placed on hold pending <br /> further notice Figure 6 is a map that depicts the locations and analytical results of these soil samples <br /> Following sample collection, the borings were backfilled with neat-cement grout from the bottom of the <br /> borehole to ground surface through the augers under PHSEHD oversight A miscommunication between <br /> the drill crew and onsite geologist resulted in placement of sand in the zone where the neat cement grout was <br /> to have been placed in wellbores for MW-4, 5, and 6 during August 18 and 19, 2003 Upon recognition of <br /> M=\D�EnvyonmenWTan=Texaw\Raports\SARi203wo Page 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.