the problem the wells were overdrilled to the bentonite plug and neat-cement placed in the wellbore as <br /> reported in the drilling logs in Appendix IV The driller did not charge the client for time lost during this <br /> effort PHSEHD staff were onsite to observe the placement of the neat cement grout and verify that wells <br /> were completed as appropriate to PHSEHD requirements and as described in the approved workplan <br /> All drilling and sampling equipment was washed prior to use In addition,to minimize cross-contamination <br /> between borings, all appropriate downhole drilling and sampling equipment was washed between borings <br /> 3.3.3 Groundwater Grab Sample Collection <br /> Groundwater grab samples were collected from soil borings using a2-inch diameter disposable PVC weighted <br /> bailer Samples were collected from soil borings PT-SB-8,9,and 10(Figure 6) Groundwater sampled was <br /> from the first encountered groundwater at a depth of about 46 5 feet bgs The groundwater grab samples were <br /> labeled, packaged, stored on ice in an insulated chest for transport and transported under chain of custody <br /> manifest to Kiff Analytical laboratory in Davis, California <br /> 3.3.4 Monrtorine Well Installation and Development <br /> Completion of monitoring wells PT-MW4, 5, and 6 consisted of a 2-inch diameter PVC casing with flush <br /> points, installed down through the hollow stem augers in accordance with well installation protocol outlined <br /> I <br /> in Appendix Il Appendix IV contains detailed diagrams of the individual well completions The wells were <br /> constructed with 40 feet of 2-inch diameter solid PVC casing to a depth of 40 feet below ground surface A <br /> screened zone from 40 to 60 feet below ground surface was set with 2-inch diameter schedule 40 PVC casing <br /> Screen size was 0 010 inch The bottom of each well was completed with a cap Filter pack material <br /> consisting of Monterey#212 sand was placed between the screened PVC casing and the formation as the flite <br /> augers were removed A 24 inch thick bentonite seal was placed around the casing and the formation from <br /> a depth of 38 to 40 feet below ground surface Neat cement grout was placed around the casing and the <br /> formation from a depth of 37 to 2 feet bgs A metal traffic box that protected the wellhead was set to a depth <br /> of 15 feet below ground surface A locking well cap was placed on the wellbore that secures the top of the - <br /> wellborn A tabulation of monitoring well construction details is presented as Table 5 <br /> Mam1RlEncnronmentallPannarTexacolReporls15AR1203wpd Page 15 <br />