Laserfiche WebLink
14'. ln-T=`nk Gauging/SIR Lq,uip..,ent: A Check this box if taiik gauging is used only for inventor, control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to pgrfud-g leak detection 6nitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? w -- •le•- •l <br /> * In the Section H,below,describe how and when theseFdeficiencies were or will be corrected. 41 <br /> G. Line Leak Detectors (LLD): 0 Check the box if LLDs are not installed. <br /> r <br /> Complete the following checklist: <br /> r" <br /> Yes ❑ No* For equipment start-do or annual equipment certification, was a leak simulated to'verify`LLD)performance? <br /> ❑ N/A. (Check all that apply) Simulated leak rate: X3 p h.; ❑ 0.1 g.p�h t ❑ 0.2 g.p.h. j <br /> 'Yes •❑ No* Were all LLDs confirmed operational and accurate+rvithhi regulatory'requirements? :;1 l <br /> Yeg ❑ Nb*' Was the testing apparatusproperly calibrated? + <br /> ❑ Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> Pr N/A ... ,r►, `� <br /> 14 Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? j <br /> ❑ N/A <br /> Jai Yes ❑ No* For electronic LLDs, does the turbine autonwfically sbut,off if any portion of the monitorii stem is disabled <br /> ❑ N/A or disconnected? <br /> 10 Yes ❑ No* For electronic LLDs,does the turbine auto=flybut bff if any portion of the monitoring system ma,�functions <br /> ❑ N/A or fails a test? - - <br /> L ❑Yes LI No* For electronic LLDs,have all accessible whin connecxigns been visually inspected? <br /> LlN/A 4;1 t <br /> Yes <br /> No* Were all items on the equipment manufacthreW91i4ainteirAnce checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 03/01 <br />