My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
3408
>
2300 - Underground Storage Tank Program
>
PR0517521
>
COMPLIANCE INFO 2007 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:44:25 PM
Creation date
5/7/2019 4:02:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2009
RECORD_ID
PR0517521
PE
2361
FACILITY_ID
FA0013484
FACILITY_NAME
FOOD 4 LESS FUEL CENTER*
STREET_NUMBER
3408
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16422011
CURRENT_STATUS
01
SITE_LOCATION
3408 MANTHEY RD
P_LOCATION
01
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 4 of 10 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: C Piping Manufacturer X Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure X Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:Vacuum pump with 0-30"hg dial gauge Equipment Resolution: <br /> HO-Tank to UDC 9-10 HO-UDC 9-10 to 7-8 HO-UDC 7-8 to 5-6 HO-UDC 5-6 to 3-4 <br /> Piping Material: Poly Poly Poly Poly <br /> Piping Manufacturer: OPW OPW OPW OPW <br /> Piping Diameter: 1.5 in. 1.5 in. 1.5 in. 1.5 in. <br /> Length of Piping Run: 40 ft. 20 ft. 20 ft. 20 ft. <br /> Product Stored: Gasoline Gasoline Gasoline Gasoline <br /> Method and location of Split test repair boot at Split test repair boot at Split test repair boot Split test repair boot at <br /> piping-run isolation: end of piping run end of piping run at end of piping run 'end of piping run <br /> Wait time between applying <br /> pressure/vacuum/water and 30 min. 30 min. 30 min. 30 min. <br /> starting test: <br /> Test Start Time: 15:30 13:25 12:10 12:10 <br /> Initial Reading(Rj): -10"hg -10"hg -10"hg -10"hg <br /> Test End Time: 16:00 13:55 12:40 12:40 <br /> Final Reading(RF): -10"hg -10"hg -10"hg -10"hg <br /> Test Duration: 30 min. 30 min. 30 min. 30 min. <br /> Change in Reading(RF-R,): No change No change No change No change <br /> Pass/Fail Threshold or No change= ass No change= ass No change= ass No change= ass <br /> Criteria: <br /> Test Result: X Pass ❑Fail I X Pass ❑Fail X Pass ❑Fail I X Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.