Laserfiche WebLink
SWRCB,January 2002 Page 3 of 10 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer $ Industry Standard ❑Professional Engineer <br /> E Other(Specify) <br /> Test Method Used: ❑ Pressure X Vacuum 2 Hydrostatic <br /> C Other(Specify-) <br /> Test Equipment Used: Vacuum pump with 0-30"dial gauge Equipment Resolution: <br /> LO-Tank to UDC 9-10 1 C O-CDC 9-10 to 7-8 LO-t.'DC 7-8 to 5-6 LO-UDC.5-6 to 3-4 <br /> Piping Material: Poh Poly Poly Poly <br /> Piping Manufacturer: OPW OPW OPW OPW <br /> Piping Diameter: 1.5 in. 1.5 in. 1.5 in. 1.5 in. <br /> Length of Piping Run: 40 ft. 20 ft. 20 ft. 20 ft. <br /> Product Stored: Gasoline Gasoline Gasoline Gasoline <br /> Method and location of Split test repair boot at Split test repair boot at Split test repair boot Split test repair boot at <br /> piping-run isolation: end of piping run end of piping run at end of piping run end of piping run <br /> Wait time between applying <br /> pressure/vacuum/water and 15 min. 15 rain. 15 min. 15 min. <br /> starting test: <br /> Test Start Time: 15:30 13:25 12:10 12:10 <br /> Initial Reading(Rt): -10"hg -10"hg -10"hg -10"hg <br /> Test End Time: 16:00 13:55 12:40 12:40 <br /> Final Reading(RF): -10"hg -10"hg -10"hg -10"hg <br /> Test Duration: 30 min. 30 min. 30 min. 30 min. <br /> Change in Reading(RF-Rt): No Change No Change No Change No Change <br /> Pass/Fail Threshold or No change=pass No change=pass No change=pass No change=pass <br /> Criteria: <br /> Test Result: X Pass ❑Fail X Pass ❑ Fail X Pass ❑Fail X Pass ❑ Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Tank to UDC 9-10(Installed new repair boots at the ends of the piping runs in both the dispenser and the tank.Had to cut approximately 3"off the rock guard as it <br /> Enters the UDC on the 87 to gain access to the secondary portion of the coaxial piping.This caused a overlap with the entry boot-) <br /> UDC 9-10 to 7-8(Install new repair boots at both ends of the piping runs.Also had to cut back approximately 3"if rock guard in order to gain access to the existing <br /> secondary portion of the 87 coaxial piping.This caused a overlap with the test boot.) <br /> UDC 9-10 to 7-8{Install new repair boots at both ends of the piping runs.Also had to cut back approximately 3"if rock guard in order to gain access to the existing <br /> secondary portion of the 87 coaxial piping.This caused a overlap with the test boot and the new rock guard termination boots} <br /> UDC 7-8 to 5-6(Install new repair boots at both ends of the piping runs.Existing rock guard termination boots are in good order} <br /> UDC 5-6 to 34(Install new repair boots at both ends of the piping runs.Also had to cut back approximately 3"if rock guard in order to gain access to the existing <br /> secondary portion of the 87&91 coaxial piping.This caused a overlap with the test boot at the#5 side on both the 87&91 secondary test boots and the rock guard <br /> Termination boots.} <br /> UDC 3-4 to 1-2 (No repairs required.Passd with original manufactured parts.) <br />