Laserfiche WebLink
SWRCB,January 2002 Page 1.0 of 10 <br /> 9. SPILL/OVERFML CONTAENWNT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer X Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:Incon TS-STS Equipment Resolution: <br /> Spill Box—R.F.B. Spill Box—R.V.B. Spill Box—P.F.B. Spill Box—P.V.B. <br /> Bucket Diameter: 12" 12" 12" 12" <br /> Bucket Depth: 15" 15" 15" 15" <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 minutes 15 minutes 15 minutes <br /> starting test: <br /> Test Start Time: 09:48 09:48 09:48 09:48 <br /> Initial Reading(R,): 1.1801" 2.5588" 2.2858" 1.9911" <br /> Test End Time: 10:04 10:04 10:04 10:04 <br /> Final Reading(RF): 1.1793" 2.5583" 2.2852" 1.9904" <br /> Test Duration: 16 minutes 16 minutes 16 minutes 16 minutes <br /> Change in Reading(RF-R,): Loss.0008" Loss.0005" Loss.0006" Loss.0007' <br /> Pass/Fail Threshold or Loss<.002"=pass Loss<.002"amass Loss<.002"=pass Loss<.002"amass <br /> Criteria: <br /> Test Result: X Pass ❑Fail X Pass ❑Fail X Pass ❑Fail X Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-u for ailed tests) <br /> Ail <br /> Ii <br /> Signature of Company Representative �� � '� Date <br /> - 1 <br />