Laserfiche WebLink
SWRCB,January 2002 Page 5 of 10 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer X Industry Standard C7 Professional Engineer <br /> C Otber(Specify) <br /> Test Method Used: ❑Pressure X Vacuum d hydrostatic <br /> -Other(Specify) <br /> Test... aipment Used:0-15.P.S.I.Gauge And Pressure Equipment Resolution: <br /> LO-UDC 3-4 to 1-2 HO-JTDC 34 to 1-2 Piping Run- Piping Run- <br /> Piping Material: Poly Poly <br /> Piping Manufacturer: Environ Environ <br /> Piping Diameter: 1.5 in. 1.5 in. <br /> Length of Piping Run: 20 ft. 20 ft. <br /> Product Stored: Gasoline Gasoline <br /> Method and location of Split test repair boot at Split test repair boot at <br /> 2i!2' -Mn isolation: end ofpi2iing run end of piping run <br /> Wart time between applying <br /> pressure/vacuum/water and 30 min. 30 min. <br /> starting test: <br /> Tcst Start Time: 09:30 09:30 <br /> Initial Reading(Rj): -10"hg A0"hg <br /> Test End Time: 10:00 10:00 <br /> Final Reading(RP): -10'°hg -10"hg <br /> Test Duration: 30 min. 30 tini.n. <br /> Change in Reading(Rp-R,): No change No change <br /> Pass/Fail Threshold or No change=pass No change=pass <br /> Criteria: <br /> Test Result: I X Pass ❑Fall X Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ©Fail <br /> COM Went$—(include information ori repairs madeprior to testing, and recommended follow-up for failed tests) <br /> Retested the secondary from the original test date of 3-22-06.This will keep all components compliant at same time. <br />