Laserfiche WebLink
SWRCB,January 2002 Page 6 of 10 <br /> 6. PIPING SUM IP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer X Industry Standard ❑Professional Engineer <br /> ❑Other(Spew) <br /> Test Method Used: 0 Premure ❑Vacuum X Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: lncon TS STS Equipment Resolution: <br /> Sump—R.P.S. Sump—P.P.S. Sump- Sump- <br /> Sump Diameter: 42" 42" <br /> Sump Depth- 60" 64" <br /> Sump Material: Fiberglass I Fiberglass <br /> Height from Tank Top to Top of 12" 121, <br /> Highest Pipipj Penetration: <br /> Height from Tank Top to Lowest 2211 23„ <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Clean Clean <br /> Portion of Sump Tested' I Full Full <br /> Does turbine shut down when <br /> sump sensor detects liquid(both X Yes 0 No 1 NA X Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> product and water?* <br /> Turbine shutdown response time 2 Seconds 2 Seconds <br /> Is system programmed for fail-safe X Yes ❑No ❑NA X Yes F_-No C NA ❑Yes ❑No ❑NA ❑Yes ❑No 0 NA <br /> shutdown?' <br /> Was fail-safe verified to be X Yes []No ❑NA X Yes ❑No ❑NA n Yes ❑No 01 NA ❑Yes ❑No ❑NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 minutes 15 minutes <br /> test: <br /> Test Stan Time: 11:21 11:21 <br /> Initial Reading(R0: 6.3062" 6.3528" <br /> Test End Time: 11:36 11.:36 <br /> Final Reading(RF): 6.3057' 6.3521" <br /> Test Duration: 15 minutes 15 minutes <br /> Change in.Reading(RF-R,): Loss.0005" Loss .0007' <br /> Pass/Fail Threshold or Criteria: Loss<.002"=pass Loss<.002"amass <br /> Teen Result: X Pass ❑Fail X Pass ❑Fail [2 Pass D Fall D Pass ❑Fail <br /> Was sensor removed for testing? X Yes ❑No ❑NA X Yes 0 No 0 NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and X Yes ❑No ❑NA X Yes ❑No [INA 0 Yes ©No 1--INA ❑Yes 7-No DNA <br /> verified functional after testing? <br /> COxI Ments—(include inf,? nTq ion on repairs made prior to testing and recomm@ndedfollow-up for failed tests1 <br /> Install new SSI test boots at the ends of all of the piping rens in the sumps and UDC's <br /> Verify that they have no leaks with soapy water. Tightest all clamps on the entries including the electrical. <br /> Plug the opening in the transition boot of the rock guard. <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to my of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SV,RCB LG-160) <br />