My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
3408
>
2300 - Underground Storage Tank Program
>
PR0517521
>
COMPLIANCE INFO 2007 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:44:25 PM
Creation date
5/7/2019 4:02:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2009
RECORD_ID
PR0517521
PE
2361
FACILITY_ID
FA0013484
FACILITY_NAME
FOOD 4 LESS FUEL CENTER*
STREET_NUMBER
3408
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16422011
CURRENT_STATUS
01
SITE_LOCATION
3408 MANTHEY RD
P_LOCATION
01
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 7 of 10 <br /> 7. UNDER-DISPENSER CONTAINMENT TESTING <br /> Test Method Developed By: C'UDC Manufacturer X Industry Standard ❑Professional Engineer <br /> C Other(SpeciA) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipmetit Used:lneon TS STS Equipment Resolution: <br /> UDC#1-2 UAC#3-4 UDC#5-6 UAC#7-8 <br /> UDC Manufachu�er: Environ OPW 7 OPW? OPW? <br /> UDC Material.: Pol Fiber lass Fibe lass Fiber lass � <br /> UDC Depth: 32" 32" 32" 32" <br /> Height from UDC Bottom to Top 14" 9" 9" 9" <br /> of Highest Piping' Penetration: <br /> Height from UDC Bottom to 4" 4" 4" 4" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Clean Clean Clean Clean <br /> testing: i <br /> Portion of UDC Tested Full Full Full Full <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both X Yes :]No NA X Yes ❑No❑NA X Yes ❑No ❑NA X Yes ❑No ❑NA <br /> product and water)?* <br /> Turbine shutdown response time 2 Seconds 2 Seconds 2 Seconds 2 Seconds <br /> Is system programmed for fail- X Yes ❑No ❑NA X Yes ❑No C NA X Yes ❑No ❑NA X Yes ❑No [INA <br /> safe shutdown?* <br /> Was fail-safe verified to be X Yes ❑No ❑NA X Yes C No 0 NA X Yes C No C NA X Yes ❑No ❑NA <br /> _operational?* <br /> Wait time between applying 15 minutes 15 minutes 15 minutes 15 minutes <br /> pressure/vacuum/water and <br /> Ttalti <br /> ing test <br /> Test Start Time: 12;29 10:37 10:37 10:37 <br /> Initial Reading(Rj: 3.3786" 4.2551" 6.2167" 5.0419" <br /> Test End Time: 12:44 11,:50 11:50 11:50 <br /> Final Reading(RF): 3.3801" 4.2544" 6.2167" 5.0399" <br /> Test Duration: 15 minutes 15 minutes 15 minutes 15 minutes <br /> Change in Reading (RF—R,)—. Gain .0015" Loss.0007" No change Loss.002" <br /> Pass/Fail Threshold or Criteria: Loss{.002"— s Loss-,002"=pass Loss<.002"— ass Loss<.002"— ss <br /> Test Result: X Paas ❑Fail X Pass p Fail X Pass ❑Fall X Pass D Fail <br /> Was sensor removed for testing? X Yes ❑No [INA X Yes ❑No 0 NA X Yes ❑No ❑NA X Yes Q No CNA <br /> Was sensor properly replaced and X Yes ❑No ❑NA X Yes ❑No❑NA X Yes ❑No [7 NA X Yes []No ❑NA <br /> verified fitnetional after testing? <br /> Comments---(include information on repairs made prior to testing, and recommended follow up,for failed Lau <br /> UDC 34--Replace two of the rock guard entries with new SSI Split 3.5"X 2.4"reducing boot, <br /> Retorque all clamps on entries after testing move the south side boots off the secondaries. <br /> UDC 56-Replace one of the rock guard entries with new SSI Split 3.5"X 2.4"reducing boot. <br /> Retorque all clamps on entries after testing move the south side boots off the secondaries. <br /> UDC 78- Replace one of the rock guard entries with new SSI Split 3.5"X 2.4"reducing boot. <br /> Retorque all clamps on entries after testing move the south side boots off the secondaries. <br /> UDC 910- Replace one of the rock guard entries with new SSI Split 3.5"X 2.4"reducing boot. <br /> Retorque all clamps on entries after testing move the south side boots off the secondaries. <br /> 1 If the entire depth of the UDC is not tested,specify how much was tested. If the answer to My of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRC8 LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.