Laserfiche WebLink
Victor Road Shell <br /> 880 Victor,Lodi <br /> Page 2 <br /> In addition to evaluating the April 19,2001 report,PHS/EHD also evaluated the Repcme <br /> Later/Size Inuvigaicn Work Plan(work plan) dated June 3,2000 prepared by Cambria on <br /> your behalf. The work plan proposed installing two cone penetrometer technology(CPT) <br /> soil borings in the vicinity of the existing UST to a depth of 100 feet bsg to evaluate the <br /> vertical extent of the contamination, as well as four additional CPT borings to 50 feet bsg on <br /> site to delineate the lateral extent of the contamination. PHS/EHD approves the work plan. <br /> The approval of the work plan is enclosed. <br /> If you have any questions,please feel free to contact Jeffrey Wong at (209) 468-0335. <br /> Donna Heran,REHS,Director <br /> Environmental Health Division <br /> Jeffrey Wong,Senior RENS Dot Lofstrom,RG <br /> LOP/Site Mitigation Unit IV LOP/Site Mitigation Unit IV <br /> C. CRWQCB,Central Valley Region—Marty Hartzell <br /> G Cambria Environmental Technologies,Inc.-Joe Neely <br />