Mr Jeffrey Wong <br /> C A M B R I A February 23, 2006 <br /> • Cambria's December 13, 2002 Response Letter/Site Investigation and Third Quarter 2002 <br /> Groundwater Monitoring Report/Work Plan presents this investigation's findings <br /> 2002 Aquifer Pump Test During October 2002, Shell conducted a 5-day aquifer pump test Data <br /> collected during the test suggest that interim remediation was effective Approximately <br /> 4,249 gallons of groundwater were extracted over the 5-day period Based on the extracted <br /> volume and sample analytical results, interim remediation removed approximately 3 33 pounds of <br /> MTBE Cambria's December 13, 2002 Aquifer Pump Test Report summarizes the test activities <br /> 2003 Well Installation During July 2003, Shell installed three off-site wells (MW-8, MW-9, and <br /> MW-10) and one deep on-site well (MW-I1) No TPHg, BTEX, or fuel oxygenates were <br /> detected in soil from well borings MW-8, MW-9, or MW-10, although the samples were analyzed <br /> outside of hold time Soil samples were not collected from well boring MW-11 because it is <br /> located near MW-1 These results complete lateral definition of petroleum hydrocarbons and fuel <br /> oxygenates in soil at this site Cambria's December 3, 2003 Site Investigation/Third Quarter <br /> Groundwater Monitoring Report and Site Conceptual Model describes this investigation <br /> 2003 Soil Vapor Extraction (SVE) Well Install and Test During September 2003, Shell <br /> installed three SVE wells (SVE-1, SVE-2, and SVE-3) During October 2003, Shell performed a <br /> 5-day SVE test using these wells During this test, approximately 2 68 pounds of TPHg and <br /> 142 pounds of MTBE were removed Due to low influent concentrations which indicate that <br /> there is insignificant impact to the source area, Shell did not recommend additional SVE <br /> Cambria's November 14, 2003 Soil Vapor Extraction Test Report documents this test <br /> 2003 Interim Groundwater Extraction (GWE) Events During September, October, and <br /> December 2003, Shell conducted three batch GWE events During each event, Shell extracted <br /> groundwater continuously from well MW-4 for 5 days During these events, approximately <br /> 19,850 gallons of groundwater were extracted, removing 8 04 pounds of MTBE Cambria's <br /> September 16, 2004 Interim Remediation Report/Work Plan/Response Letter presents the interim <br /> remediation results <br /> 2005 SVE Reevaluation As requested by SJCEHD, Shell reevaluated SVE activities conducted <br /> at the site and provided recommendations for future activities in the July 27, 2005 Soil Vapor <br /> Extraction Reevaluation Report Shell concluded that recent soil matrix data, vapor concentration <br /> data from SVE testing, and groundwater data indicate that MTBE is no longer present at <br /> significant concentrations in soil near the USTs and did not recommend additional SVE <br /> 2005 Temporary GWE System Installation Shell constructed a temporary GWE system with <br /> • aboveground remediation pipe, air lines, an equipment container, a Baker tank, hose ramp <br /> 4 <br />