My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0008941
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2900 - Site Mitigation Program
>
PR0503634
>
ARCHIVED REPORTS XR0008941
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 4:53:40 PM
Creation date
5/7/2019 4:25:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008941
RECORD_ID
PR0503634
PE
2950
FACILITY_ID
FA0005914
FACILITY_NAME
VICTOR ROAD SHELL
STREET_NUMBER
880
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905032
CURRENT_STATUS
02
SITE_LOCATION
880 VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr Jeffrey Wong <br /> C A M B R I A February 23, 2006 <br /> . coverings, and pneumatic submersible pumps and started up the system on September 29, 2005 <br /> These activities are described in Cambria's October 12, 2005 Interim Remedial Action Plan <br /> Table 1 presents well and boring data, Table 2 presents historical soil analytical data, and Table 3 <br /> presents historical grab groundwater analytical data Sod boring and well locations are shown on <br /> Figure 2 <br /> INVESTIGATION SUMMARY <br /> Cambria directed the installation of groundwater monitoring wells MW-12 through MW-15 and <br /> soil boring SB-6 at the locations shown on Figure 2 Cambria presents our standard field <br /> procedures for soil boring and monitoring well installation in Attachment A and summarizes the <br /> details of the investigation below <br /> Personnel Present Cambria Staff Geologist Ron Barone directed the field activities, <br /> working under the supervision of California Professional <br /> Geologist Aubrey Cool <br /> Permit Cambria obtained well permit (Permit SR # 44787) from the <br /> SJCEHD (Attachment B) <br /> Drilling Company Gregg Drilling and Testing, Inc of Martinez, California <br /> (C57 License No 485156) <br /> Drilling Dates November 21 through 29, 2005 <br /> Drilling Method 10-inch hollow-stem augers <br /> Number of Borings Five borings were drilled (SB-6 and MW-12 through MW-15) <br /> and four were converted into monitoring wells (MW-12 through <br /> MW-15) Well construction specifications are summarized in <br /> Table 1, and well and boring locations are shown on Figure 2 <br /> Boring Depths Borings SB-6, MW-12, MW-13, MW-14, and MW-15, were <br /> advanced to 65 fbg, 65 fbg, 70 fbg, 64 fbg, and 100 fbg, <br /> respectively <br /> Groundwater Depths Cambria observed first-encountered groundwater during drilling <br /> activities in borings SB-6 and MW-12 through MW-15 at depths <br /> • ranging from approximately 55 to 59 fbg Blaine Tech Services, <br /> Inc (Blaine) of San Jose, Califomia measured groundwater in <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.